My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DAVIS
>
8709
>
3500 - Local Oversight Program
>
PR0544612
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2019 12:41:58 PM
Creation date
7/1/2019 11:24:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544612
PE
3528
FACILITY_ID
FA0009287
FACILITY_NAME
NORTH STOCKTON AUTO SVC INC
STREET_NUMBER
8709
Direction
N
STREET_NAME
DAVIS
STREET_TYPE
RD
City
STOCKTON
Zip
95209
APN
07242018
CURRENT_STATUS
02
SITE_LOCATION
8709 N DAVIS RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> Ms. Lori Duncan <br /> Page 2 <br /> The samples will be submitted 'lo a State-certified laboratory for analysis of total petroleum <br /> hydrocarbons as gasoline usingTEPA method 8015; total oil and grease using method 418.1''or <br /> 5520; benzene, toluene, ethylbenzene, xylenes using EPA method 8020; and volatile organic <br /> compounds including gasoline oxygenate additives using EPA method 8260. <br /> y <br /> All sampling and drilling equipment will be washed thoroughly with laboratory-grade detergent <br /> and water between uses to minimize the potential for cross contamination. Wastewater <br /> generated from decontamination activities will be placed into DOT approved containers and ' <br /> stored on site pending waste disposition options. Soil cuttings will likewise be drummed <br /> pending the receipt of analytical results. Upon completion the boring will be backfilled to the <br /> ground surface with neat"cement grout tremmied in place. <br /> All site activities will be.conducted in accordance with the site Health and Safety Plan and <br /> `� ; ��QAIQC plan onfile"with PTIS_/EHD:—`A drtiil ng peimit�application will-Ue submitted following <br /> approval of this workplan. <br /> If you have any questions or comments please cond Zero at your convenience. <br /> t�D. GP <br /> Respectfully, 4V <br /> Grou d ro Analysis nc. a GREGORY P. <br /> STAHL <br /> No. 5023 <br /> Gregory P. Stahl, RG 5023 <br /> tp <br /> CA Certified Hydrogeologist No. 264 I�TF OF CA11E�Q��R <br /> cc: Mr. Ed Niemann; North Stockton Auto Service <br /> Mr_ Marty Hartzell, RWQCB <br /> Karen Collins, Environmental Closures <br /> 7. <br /> nsauto\reportsladdendum.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.