Laserfiche WebLink
• <br /> HEALTH AND SAFETY PLAN <br /> 1.0 INTRODUCTION <br /> 1. This Health and Safety Plan(Plan)will be in effect during tank removal and soil sampling at <br /> at the Santa Fe Railway Company facility in Stockton,California. The plan considers the <br /> potential exposure to soil containing elevated levels of petroleum hydrocarbons and volatile <br /> organic compounds during the excavation and removal of three underground storage tanks <br /> 2.0 PERSONNEL <br /> 1 Health and Sgf=Officer-The Health and Safety Officer will be responsible for briefing the <br /> field personnel and contractors,prior to project initiation and as appropriate during <br /> operations,on hazard assessment,personal protective equipment,and implementation of the <br /> plan. <br /> 2. EMectManag -The Project Manager.responsible for all technical aspects of the project, <br /> will assure that the health and safety requirements are implemented and will resolve any <br /> related conflicts which may arise. <br /> 3. All field personnel will be responsible for understanding and complying with the health and <br /> safety plan They will be required to acknowledge and sign a copy of this plan and attend <br /> briefings prior to site work. <br /> 3.0 CONTAMINANTS <br /> 1. This specific Plan is based on the potential for exposure to soils containing petroleum <br /> hydrocarbons such as gasoline,diesel and heavy oils. Volatile organic compounds <br /> potentially present in the soils may include benzene,toluene,ethylbenzene and xylenes. <br /> ENVIRONMENTAL SOLUTIONS <br />