Laserfiche WebLink
WEISS ASSOCIATES <br /> Typical Monitoring Well Construction Detail <br /> Ground Surface 0 <br /> GRAPHIC LOG DESCRIPTION <br /> ..... <br /> Asphalt <br /> ' _— Silty CLAY(CH),dark brown,stiff,damp, <br /> --___- highly plastic, low K <br /> —_—_- Orange-brown,30-50%silt,moderately <br /> ' _—_�= plastic below 3 ft <br /> Portland <br /> cement with 5 ---___ Clayey SILT(ML),yellow-brown,medium <br /> 3-5% stiff,wet,moderately plastic, law K <br /> ' bentonite <br /> _ Mottled brown-gray,possible very slight <br /> —= hydrocarbon odor from 7 to 8 ft <br /> ' 4"PVC — <br /> Casing 10 ----_ <br /> -'-- <5%very fine sand,possible very slight <br /> --__-_ hydrocarbon odor from 10 toil 5 ft <br /> ' — (Contact from driller) <br /> - Sandy SILT(ML),orange-blown, medium <br /> Bentonite ___ _ stiff, moist to wet,20-30%very fine sand, <br /> ' pallet seat i5 - - <5%clay, possible very slight hydrocarbon <br /> odor,modK- - - - - - - - - - - - -- - - - <br /> #3 _ -_ Silty SAND(SM),yellow-brown, medium stiff, <br /> Monterey _ - damp, 10-20%silt,very fine to fine sand, <br /> sand slight to moderate hydrocarbon odor,mod to <br /> Q <br /> high K <br /> —_—_0 020"slotted 20 --- — below i6 5 ftmoderate hydrocarbon odor <br /> r 4"PVC --_—_= <br /> casing "---- ,Clayey SILT,(ML),gray-brown,loose to <br /> -= - medium stiff, moist to wet,5-10%very fine <br /> PVC end cap sand, 10-20'/o clay,slight to moderate <br /> hydrocarbon odor,low K <br /> --_ Sandy SILT(M),from 23 to 23 5 ft,gray-brown, <br /> Bentonite 25 - — 20-300/.very fine sand, mod K,very slight <br /> pellet plug _ hydrocarbon odor <br /> (it necessary) Soft from 23 5 to 24 5 ft <br /> Silty CLAY (CH),blue-gray,stiff,high <br /> 0 2 4 6 plasticity, no odor,very low K[Bay Mud?] <br /> in Radius EXPLANATION <br /> Z Water level during drilling(date) Logged by <br /> ' Q Water Level(date) Supervisor <br /> Contact(dashed where approx) Drilling Company <br /> - - - - Uncertain Contact Driller <br /> Gradational Contact Drilling Method <br /> Location of recovered drive sample Dates Drilled <br /> . <br /> Location of drive sample collected for Well Head Completion <br /> �+{ chemical analysis Type of sampler <br /> C-} Grab sample <br /> K=Esumated hydraulic conductivity <br /> Boring Log and Well Construction Details <br /> Figure 6 Typical Monitoring Well Construction Detail and Sample Soil Boring Log <br />