My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
306
>
1600 - Food Program
>
PR0521471
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2020 4:44:50 PM
Creation date
7/3/2019 2:38:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0521471
PE
1613
FACILITY_ID
FA0014579
FACILITY_NAME
T BAGEL CAFE
STREET_NUMBER
306
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
14914012
CURRENT_STATUS
01
SITE_LOCATION
306 E MAIN ST STE 200B
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
JCastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Q <br /> ASSEMBLY INSTRUCTIONS <br /> FOR THE OVEN AND PROOFER <br /> DECK OVEN <br /> Your Super Systems oven is shipped completely assembled with the exception of the chrome <br /> plated wire bake racks.These bake racks are packed in a separate box with your shipment.The <br /> light weight, bake rack should be placed on each deck with the four long wires down. The <br /> bake racks provide the correct spacing between the deck and the product for proper baking <br /> along with making it easier to slide the pans in and out of the oven. <br /> PROOFER <br /> Place the stainless steel water pan into the opening in the bottom.of the unit, on top of the heat- <br /> ing element, <br /> There are mounting brackets on the top and bottom sides of the proofer for the side racks. Place <br /> the top of the side rack in the top mounting brackets (front & back) and lift up.Then put the bot- <br /> tom of the side rack in the bottom brackets (front & rack) and push down to the vertical posi- <br /> tion. (see Figure #1 below) <br /> Next slide the horizontal shelf racks in place so they rest on the rungs of the side racks. The <br /> side racks will accommodate g shelf racks, 6 are furnished with the unit. <br /> INSTALLING RACKS <br /> nauRE#7 <br /> a <br /> 4 <br /> INSTALLING DRIP TROUGH <br /> Mount the drip trough on the screws that are located on the front of the unit along the bottom <br /> of the proofer. <br /> r . <br />
The URL can be used to link to this page
Your browser does not support the video tag.