My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DUCK CREEK
>
3633
>
2900 - Site Mitigation Program
>
PR0522088
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2019 4:51:10 PM
Creation date
7/3/2019 2:55:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0522088
PE
2950
FACILITY_ID
FA0015050
FACILITY_NAME
RYDER TRUCK RENTAL
STREET_NUMBER
3633
STREET_NAME
DUCK CREEK
STREET_TYPE
DR
City
STOCKTON
Zip
95215
APN
17331001
CURRENT_STATUS
01
SITE_LOCATION
3633 DUCK CREEK DR
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11/13/2003 09:04 94972314 FREY ENVIRONMENTAL PAGE 02/1 <br /> FREY ENVIRONMENTAL, INC. <br /> Environmental Geologists, Engineers,Assesson <br /> 2817A Lafayette Avenue <br /> Newport Beach, C4 9266-- <br /> November <br /> 266=November 12, 2003 (949)723-164` <br /> 053-60 Fax(949)723-185• <br /> Email. freyincL&freymc.con <br /> Margaret Lagorio <br /> San Joaquin County <br /> Environmental Health Department <br /> 304 East Weber Avenue <br /> Third Floor <br /> Stockton, CA 95202 <br /> WORKPLAN <br /> LIMITED SOIL EXCAVATION <br /> RYDER LC 1071 <br /> 3633 DUCK CREEK DRIVE <br /> STOCKTON, CALIFORNIA <br /> Dear Mr. Lagorio: <br /> This workplan has been prepared for the removal of soil containing petroleum hydrocarbons from <br /> the Ryder facility located in Stockton, California(Site-Figure 1). <br /> The Site currently operates as a commercial truck leasing and repair facility. The Site occupies <br /> approximately 4.6 acres of flat land at the western termination of Duck Creek Drive. The <br /> surrounding area consists of warehousing and industrial facilities. Highway 99 fomes the western <br /> property line of the Site. <br /> BACKGROUND <br /> Soil Sampling on September 18,2003 <br /> Bonsall Petroleum conducted product piping and fuel dispenser upgrade activities at the Site in <br /> September, October and November of 2003. On September 18, 2003, FREY Environmental, Inc. <br /> (FREY) collected one soil sample from beneath each of nine fuel dispensers (labeled Dl through <br /> 139). Five soil samples were collected from beneath the fuel product piping(labeled PI through P5). <br /> One soil sample was collected from beneath a fresh oil dispenser(labeled O 1). Soil sample locations <br /> are shown on Figure 2. <br /> In general,soil samples collected from beneath the fuel dispensers and product piping were analyzed <br /> for total petroleum hydrocarbons modified for diesel(TPH-d)in accordance with EPA Method No. <br /> 8015M. Selected soil samples collected from beneath the fuel dispensers and product piping were <br /> analyzed for total petroleum hydrocarbons modified for gasoline(TPH-g)in accordance with EPA <br />
The URL can be used to link to this page
Your browser does not support the video tag.