Laserfiche WebLink
Geo6gkdTechnics Inc. • • Page 3 <br /> George's Service <br /> Project No.: 425.2 <br /> April 10, 1998 <br /> Additional Site Characterization Work <br /> • prepare work plan <br /> • assist George's Service in obtaining easements& agreements with adjoining property owners <br /> • install 3 groundwater monitoring wells into the deeper aquifer zone to determine the volume <br /> of groundwater impacted and provide information needed to perform the risk evaluation. <br /> • test soil samples as required from each borehole for TPH-G, BTEX, MTBE and select <br /> geophysical parameters (permeability, porosity,bulk density, TOC) <br /> • test water samples from each monitoring well for TPH-G, BTEX, MTBE and the other <br /> oxygenated fuel compounds <br /> • survey the top of casings of the new wells and survey in the locations of domestic wells and <br /> neighboring properties as requested by PHSEHD <br /> • update site map <br /> • perform quarterly groundwater monitoring and reporting <br /> • prepare a report summarizing all the site characterization data <br /> Listed below is a proposed schedule for implementing this project. <br /> Proposed Biddine of Project <br /> To remain in compliance with the USTCFP, Geological Technics Inc. requested V&W Drilling <br /> to prepare for drilling and installing the 3 groundwater monitoring wells. We have found V&W <br /> to be very cost effective for three primary reasons: <br /> • reasonable charge rate <br /> • fast drilling equipment <br /> • well trained crew <br /> A bid was requested from Duane Kimball, licensed land surveyor to survey in the top of casing <br /> elevations for the new wells. We have found Mr. Kimball to be considerably cheaper then other <br /> surveying companies (usually by about 50%), and more responsive to our requests. <br /> These costs have been included in our budget spread sheet prepared giving estimated costs for <br /> performing the work approved by SJCEHD. The budget spread sheet is attached and shows <br /> itemized cost for the tasks proposed. In an attempt to make this Pre-Approval flow smoothly, we <br /> have used the same unit costs for this work that has previously been approved by the USTCFP <br /> for other projects. <br /> Geological Technics Inc. accepts field support services and lab invoices and adds a 15% <br /> overhead fee. We then pay these charges and assist George's Service in filling out the USTCFP <br /> reimbursement claim. Construction contractors will invoice George's Service direct since <br /> Geological Technics Inc. is not a licensed contractor. <br />