My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DURHAM FERRY
>
1600
>
3500 - Local Oversight Program
>
PR0544624
>
SITE INFORMATION AND CORRESPONDENCE FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2019 5:48:15 PM
Creation date
7/3/2019 3:27:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0544624
PE
3526
FACILITY_ID
FA0005206
FACILITY_NAME
GEORGES SERVICE
STREET_NUMBER
1600
Direction
W
STREET_NAME
DURHAM FERRY
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25510004
CURRENT_STATUS
02
SITE_LOCATION
1600 W DURHAM FERRY RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br /> Creo(&AIT"IiaInc. • • Page 2 <br /> Georges Service <br /> Project No.: 425.3 <br /> January 22,2003 <br /> Proposed Bidding of Project <br /> Del-Tech Geotechnical Support, prepared a bid for the development and sampling of the <br /> monitoring wells. A bid was obtained from V&W Drilling for the installation of the new wells. <br /> Del-Tech and V&W bids are attached. <br /> The budget spreadsheet is attached and shows itemized costs for the proposed tasks. In an <br /> attempt to make this Pre-Approval flow smoothly, we have used the same unit costs for this <br /> work that has previously been approved by the USTCFP for other projects. <br /> Tentative Schedule for Implementing Work <br /> Task Description Schedule <br /> • Submit Cost Pre-Approval Request to USTCFP for approval January, 2003 <br /> • Receive approval of Costs from USTCFP February, 2003 <br /> • Install four monitoring wells March, 2003 <br /> • Perform first groundwater Monitoring March, 2003 <br /> Attached are copies of SJC PHS/EHD correspondence, work plan, and bids. <br /> Thank you for your attention to this project. Call me if you have questions or need <br /> clarification. Respectfully Submitted, <br /> Raynold I. Kablanow II, Ph.D. <br /> cc: Mei Teranishi <br /> Nuel Henderson— San Joaquin County <br />
The URL can be used to link to this page
Your browser does not support the video tag.