George's Service <br /> Remedial Action Work Plan <br /> Project No.425.2 <br /> June 30,2011 <br /> 7. REMEDIATION DATA COLLECTION AND ANALYSIS <br /> The air sparging/low-vacuum extraction system will be monitored daily for the first week of <br /> operation, weekly for the next four weeks of operation, and monthly thereafter. Data <br /> collected during remedial activities will be included and discussed in the semi-annual <br /> groundwater monitoring reports. It is important to note that the proposed monitoring <br /> schedule may be adjusted according to requirements of the SJVUAPCD permit. <br /> 7.1. Emission Monitoring <br /> Prior to installation of the low-vacuum extraction system, an Authority to Construct Permit <br /> (ATC) will be obtained from the San Joaquin Valley Air Pollution Control District <br /> (SJVAPCD). <br /> GTI proposes the following monitoring be conducted daily for the first week of operation, <br /> weekly for four weeks and monthly thereafter, unless noted: <br /> • Portable photo-ionization detector readings; <br /> • Laboratory samples will be collected from an effluent sample port and tested for TPH- <br /> G and BTEX by EPA method TO-3; <br /> • Monitor effluent flow rates; <br /> • Monitor hours of operation, electrical usage, vacuum and temperature; <br /> • Perform routine maintenance of equipment(monthly). <br /> A monitoring log,horizontal piping diagram, and a copy of the ATC permit will remain on- <br /> site, available for inspection, at all times. <br /> 7.2. Air Sparge Monitoring <br /> Inspection events(by GTI staff) will include monitoring of the following parameters: <br /> • all performance functions of the treatment system; <br /> • measuring and recording gas flow. <br /> 7.3. Depth to Water Measurements <br /> On site and off site monitoring wells will be monitored on a weekly basis for the first month <br /> to ensure that significant groundwater mounding that could spread the contamination is not <br /> occurring. Once acceptable conditions have been realized, depth to water will be measured <br /> on a monthly basis. <br /> 7.4. Groundwater Parameters <br /> On site and off site monitoring wells will be monitored monthly for DO & ORP values to <br /> track the development of the remedial plan. The wells to be included are: MW-1, 2, 2x, 3,4, <br /> 5, 6, 7, 8, 101, 102, 106, & 107. As monitoring progresses, w4propose to eliminate excess <br /> wells from the monthly routine if they do not provide valuable information or duplicate <br /> information. <br /> Geological Tecknicslnc. 20 <br /> 4252 RAP.docx <br />