My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DURHAM FERRY
>
1600
>
3500 - Local Oversight Program
>
PR0544624
>
WORK PLANS FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2019 6:03:33 PM
Creation date
7/3/2019 3:33:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 2
RECORD_ID
PR0544624
PE
3526
FACILITY_ID
FA0005206
FACILITY_NAME
GEORGES SERVICE
STREET_NUMBER
1600
Direction
W
STREET_NAME
DURHAM FERRY
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25510004
CURRENT_STATUS
02
SITE_LOCATION
1600 W DURHAM FERRY RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gtolo&l recknlcs lac. • • Page 4 <br /> TRAP-Pilot Test <br /> Project No. 425.2 <br /> June 14,2005 <br /> 2.1.1 Post Ozone Sparging Monitoring <br /> GTI will monitor and sample the observation wells for a month on a weekly basis after the <br /> completion of injection phase to check the post-injection effects. Water will be analyzed for <br /> the general field parameters (temperature, pH, DO, ORP & EC) as well as TPH-g, BTEX, <br /> MTBE, TBA,TBF, acetone, hexavalent chromium and iron as described above. <br /> 2.2 Proposed Soil Vapor Extraction Pilot Testing <br /> A Vapor Extraction System (SVE) pilot test will be performed prior to the Ozone Sparge test. <br /> The SVE test will be conducted with portable equipment to reduce installation costs. The <br /> SVE test will utilize the two vapor wells previously emplaced in the excavation back fill area <br /> as described in the Plan (dated March 21, 2005). Extraction will be accomplished with a <br /> small Rotron blower with capacity of approximately 100 cfm. Emission treatment will be <br /> accomplished by use of two 55-gallon carbon units that will be recycled upon completion. <br /> If needed, a permit will be obtained from San Joaquin Valley Unified Air Pollution Control <br /> District to operate SVE system before the operation of the system. <br /> SVE system will be operated for approximately 24 to 48 hours prior to start of ozone <br /> sparging. Air samples (one sample after 10 minutes of operation, one sample after 12 hrs, 24 <br /> his and one at the end of operation period) will be taken during this operation to analyze for <br /> TPH-g, BTEX and MTBE. In addition, vacuum pressure measurements will be taken from <br /> monitoring wells and observation wells surrounding the tank excavation pit (MW-2, 5 & 8; <br /> OS-1, OW-1 &2). <br /> The SVE system will not be operated during the sparging process. However, SVE system <br /> will be operated for 24 hours after the completion of sparging period, and similarly three <br /> samples will be collected to compare with the background samples to check for migration of <br /> vapors by sparging and the feasibility of SVE system. <br /> 3.0 ASSESSMENT OF REMEDIAL EFFECTIVENESS <br /> Groundwater samples will be collected as described in Sections 2.1 & 2.1.1 prior to, during <br /> and after the ozone injection phase. GTI will analyze all the sample results at the end of pilot <br /> testing period to assess the remedial effectiveness of ozone sparging. <br /> Similarly, air sample results will be analyzed to evaluate the remedial effectiveness of the <br /> SVE system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.