Laserfiche WebLink
' George's Service • • <br /> Pilot Test Work Plan <br /> rTREATMENT SYSTEM PARAMETERS <br /> ' In a letter dated September 23, 2014, GZA proposed modifications to the operation and <br /> maintenance schedule as well as the monitoring program. The changes were approved by <br /> EHD in a letter dated September 26, 2014. <br /> • Operation and maintenance has been reduced from a bi-weekly schedule to a monthly <br /> schedule. ,'�"o- rl <br /> p('�SS o I J+-�I D- Va � <br /> ' • Performance monitoring has been reduced from monthly monitoring to quarterly <br /> monitoring. <br /> Groundwater will be monitored and sampled quarterly for one year to assess the <br /> impact of the new wells. After one year the monitoring program will be reduced to <br /> semi-annual events. <br /> Air Sparging Treatment <br /> Ground Zero also proposes a change in the sequence of air sparging. Currently, five of the <br /> ' wells in consecutive sequence are between the structure and Durham Ferry Road. GZA <br /> believes this could cause excessive mounding in that area. GZA proposes that the sequence ',� <br /> be changed to the following order: OS-1, -2, AS-3, AS-1, AS-6, AS-5, and AS-2 for 20 y Y0low <br /> ' minutes each followed by a 30 minute delay prior to starting the sequence again. GZA d'r)``- <br /> believes this will effectively disperse air into the aquifer while reducing prolongedlAk <br /> groundwater mounding. / 7 <br /> r <br /> Soil Vapor Extraction and Treatment <br /> Ground Zero proposes alternating vapor well configuration monthly to deter the creation of <br /> ' preferential pathways in the vadose zone. The well configuration changes will be logged on (� <br /> the field log book. <br /> Monthly Treatment System Performance Monitoring <br /> Ground Zero proposes that monthly readings be recorded on the air sparging system. The <br /> technician will record pressure readings to the manifold from the compressor as w .1P 1 ac total <br /> system operating hours. Pressure, flow, and cycle rimes will be recorded for each AS well. <br /> The air manifold will be checked monthly for leaks and repaired as necessary. Air sparging <br /> ' wellheads will be inspected quarterly for leaks and repaired as necessary. Semi-annual <br /> maintenance will be performed on the compressor. <br /> Ground Zero proposes that during the monthly operation and maintenance event, PID gkkr l d <br /> readings will be taken and recorded from the influent, intermediate and effluent sample ports l7 c t- <br /> of the treatment system. Influent and effluent flow will also be measured and recorded. O)�- <br /> Quarterly Treatment System Performance Monitoring C <br /> �krn lAjl. <br /> ' it sparging per will be monitored quarterly by measuring and recording dissolved_fW 14P ai <br /> ox <br /> Currently MW-1, MW-2, MW-7, MW-101,temperature, pH, conductivity, and oxidation-reduction potential in selected wells. <br /> OW-1 and OW-2 are used to monitor system <br /> Ground Zero Analysis,Inc. 2 <br /> 1 <br />