Laserfiche WebLink
I <br /> 1 George's Service r • <br /> Pilot Test Work Plan <br /> effectiveness on a monthly basis. Ground Zero proposed monitoring these wells quarterly <br /> which was approved by EHD in a letter dated September 26, 2014. Q <br /> ' Quarterly influent samples will be collected and submitted to a California certified laboratory <br /> for analysis of total petroleum hydrocarbons as gasoline (TPHg); benzene, toluene, 7 S �k <br /> 1(Y�' t�� ethylbenzene and total xylenes (BTEX), methyl tert-butyl ether (MTBE) and 1,2- ( 'Y� <br /> ' ( . �1(t' dichloroethane (1,2-DCA). If PID readings detect breakthrough at the intermediate sample I Zn <br /> port, a sample will be collected to determine if carbon replacement is warranted. Lek <br /> ' GROUNDWATER MONITORING <br /> ' Current Quarterly Groundwater Monitoring and Sampling <br /> The current groundwater monitoring regime is summarized below. Ground Zero recommends L^" <br /> continuing this protocol. <br /> First and Third Quarters <br /> • Quarterly performance monitoring: MW-1, �-2, WOW-1 and OW-2,)i� <br /> • Depth to water measurements: MW-1,MW , W8, 7WdW-2 dPwh <br /> X- <br /> �_ ✓bp • Groundwater analysis: M)9,1, M 2, OW-1 O �- -(TPH , BTEX, TBE and <br /> 1,2-DCA by EPA method 8260132 44,fA,ov 7 n, <br /> 9 7' <br /> Second Ouarter <br /> • Quarterly performance monitoring: MW-1, MW-2, MW-7,MW-101, OW-1 and OW-2 04 <br /> • Depth to water measurements: MW-1, MW-2, MVY-41 M -5, MW-7, MW-8, MW- W 7 <br /> W l, k <br /> µ� 0 0W-1 and OW-2 -z2 -1' No tip �Ict, <br /> W; � Groundwater analysis: MW-1, MW-2, MW-4, MW-5, MW-7, MW-8, MW-102, OW-1, <br /> /t QW-2 and domestic well 1697 Durham Ferry Road (TPHg, BTEX, MTBE and 112- <br /> No ? , <br /> ' /DCA by EPA method 8260B) Y, <br /> Fourth Ouarter <br /> ' . Quarterly performance monitoring: MW-1, MW-2,MW-7, MW-101, OW-1 and OW-2 <br /> Depth to water measurements: MW-1, MW-2, MW 2X MV`I-8, MW-101, MW-201 <br /> .�3� <br /> MW-202, OW-1 and OW-2 � 32Ijo <br /> ' • Groundwater analysis: MW-1,MW-2, MW-7,MW 18, OW-1 and OW-2 (TPHg, BTEX, <br /> MTBE and 1,2-DCA by EPA method 8260B) ND 06 <br /> ' Future Quarterly Groundwater Monitoring and Sampling <br /> Ground Zero proposed quarterly groundwater monitoring be conducted for one year and then <br /> ' reduced to semi-annual monitoring which was approved by EHD in a letter dated September <br /> 26, 2014. Beginning in the fourth quarter of 2015, Ground Zero proposes the following <br /> modified schedule. <br /> First and Third Ouarters `�� 7,c <br /> Ground Zero Analysis,Inc. 3 <br /> 1 <br />