Laserfiche WebLink
George's Service • <br /> Pilot Test Work Plan <br /> ' • Quarterly performance monitoring: MW-1, MW-2, MW-7, MW-101, OW-1 and OW-2 <br /> ' Second Ouarter <br /> • Quarterly performance monitoring: MW-1, MW-2,MW-7, MW-101, OW-1 and OW-2 <br /> • Depth to water measurements: MW-1, MW-2, MW-4, MW-5, MW-7, MW-8, MW- <br /> 102, OW-1 and OW-2 <br /> • Groundwater analysis: MW-1, MW-2, MW-4, MW-5, MW-7, MW-8, MW-102, OW-1, <br /> ' OW-2 and domestic well 1697 Durham Ferry Road (TPHg, BTEX, MTBE and 1,2- <br /> DCA by EPA method 8260B) <br /> Fourth Ouarter <br /> • Quarterly performance monitoring: MW-1, MW-2, MW-7, MW-101, OW-1 and OW-2 <br /> • Depth to water measurements: MW-1, MW-2, MW-2X, MW-8, MW-101, MW-201, <br /> ' MW-202, OW-1 and OW-2 <br /> Groundwater analysis: MW-1, MW-2, MW-7, MW-8, OW-1 and OW-2 (TPHg, BTEX, <br /> MTBE and 1,2-DCA by EPA method 8260B) <br /> ' PILOT TEST <br /> Ground Zero anticipates the pilot test will occur for one year. The effectiveness of the <br /> treatment systems will be evaluated semi-annually and will be included in the semi-annual <br /> groundwater monitoring and treatment system effectiveness reports. The fourth quarter 2015 <br /> semi-annual groundwater monitoring and treatment system effectiveness report will include <br /> ' recommendations regarding remediation options going forward. <br /> G <br /> ' SIGNATURES & CERTIFICATION ap1Al t�y� Il,O <br /> ERIC LEE PLACE <br /> ' • <br /> NO.5414 <br /> Eric L. Price, PG#8414 9rFOF CO� <br /> Senior Geologist <br /> 1 <br /> t <br /> Ground Zero Analysis,Inc. 4 <br />