' Geological Technics Inc -- -- -- J-- -- r=- — -`------ --- �--- -- Page 3 --- _�- - -- -_- <br /> George's Service <br />' Additional Site Characterization Work Plan <br /> . Project No 2812 <br /> January 29,1996 <br /> l <br />' operated by V&W Drilling Inc (C57 lic 710678) Soil cuttings will be stockpiled on <br /> site within the fenced yard and underlain and covered with plastic <br />' Three Shallow Monitoring Wells <br /> The shallow monitoring wells will be constructed using 2 0 inch diameter PVC t <br /> casing with flush threads The screened interval will extend from five feet above the <br /> water table to ten feet below the water table From existing data, groundwater is <br /> expected to be located between 8 and 13 feet below grade If a significant clay unit is <br /> encountered during the drilling of the well, the well may be seated no greater than 3 <br /> ft into that fine grained unit A #3 sand filter pack will surround and extend two <br /> feet above the 0 020" screened interval A granular bentonite transition seal will be <br /> installed and hydrated A surface seal will be achieved by pumping a neat cement <br />� grout (augmented with < 4% bentonite) via a tremae tube The well will be secured <br /> with a locking watertight cap encased in flush mounted traffic rated well box <br /> One Deep Monitoring Well <br /> The deeper monitoring well will be constructed using 2 0 inch diameter PVC casing <br />�. with flush threads A 2 5 foot discrete screened interval will be targeted at an <br /> appropriate zone no less than 25 feet beneath the water table The actual well <br /> construction details will be decided in the field with consultation with the <br /> supervising registered professional geologist Ray An appropriate sized sand filter <br /> pack will surround and extend two feet above the screened interval A weighted <br /> granular bentonite transition seal will be installed and allowed to hydrate A surface <br />' seal will be achieved by pumping a neat cement grout (augmented with < 4% <br /> bentonite) via a tremle tube The well will be secured with a locking watertight cap <br /> encased in flush mounted traffic rated well box <br />' Well Development <br /> After the well sealing materials have set (>24 hours) the well will be developed <br />' (using mechanical surging and pumping methods) until a clear stream of water is <br /> obtained The well will be purged and groundwater samples collected no sooner <br /> than 24 hours after well development All development and purge water will be <br /> containerized in 55 gallon DOT approved containers and stored on site until their <br /> disposition can be arranged <br /> 1 The top of casing measuring point for each well will be surveyed into an arbitrary <br /> plane by a licensed land surveyor <br />