My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0011392
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DURHAM FERRY
>
1600
>
3500 - Local Oversight Program
>
PR0544624
>
ARCHIVED REPORTS XR0011392
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2019 6:23:41 PM
Creation date
7/3/2019 4:04:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011392
RECORD_ID
PR0544624
PE
3526
FACILITY_ID
FA0005206
FACILITY_NAME
GEORGES SERVICE
STREET_NUMBER
1600
Direction
W
STREET_NAME
DURHAM FERRY
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25510004
CURRENT_STATUS
02
SITE_LOCATION
1600 W DURHAM FERRY RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c7 olog4uITecm=far- Page 2 <br /> Work Plan <br /> George's Service <br /> Project No 425 2 <br /> August 16,2004 <br /> i Inr dated June 28 2004 Nuel C Henderson Jr R G San Joaquin County <br /> the letter q <br /> Environmental Health Department (EHD) reviewed and accepted the proposed method of in <br />' situ oxidation remedial method in the Feasibility study dated 28 April 2004, and asked us to <br /> prepare and submit the work plan for Bench Scale Testing This report is the work plan for <br /> Bench Scale Testing for in situ oxidation as a remedial method <br /> 2.0 PURPOSE OF STUDY <br /> The purpose of this following proposed bench scale study is to evaluate the effects of <br /> infecting ozone into the aquifer materials on the mobilization of metals into solution This <br /> study will follow the requirements given by Central Valley Regional Water Quality Control <br /> Board (CVRWQCB), which is attached in Appendix A The bench scale study will help to <br /> ' determine the effectiveness of this in situ remedial process and its cost effectiveness <br /> 3.0 SAMPLING PROCEDURE <br /> The soil samples will be taken from Bench Scale Sampling (BSS) location as shown in <br /> Figure 2 The cross section of the site is shown is Figure 3. One sample will be collected <br /> from the upper clay unit at 10 to 12 ft bgs and the other sample will be collected from the <br /> upper sandy unit at 20 to 22 ft bgs <br /> ' These samples will be mixed together in equal proportions to make 50 50 ratio This location <br /> for sampling will provide enough room for drilling away from other subsurface influences <br /> such as closely spaced well and soil excavation Soil samples will be collected using a <br /> licensed driller All soil core samples will be sealed with Teflon, capped with end caps, <br /> marked for vertical orientation, labeled and placed in a chilled cooler for transport to the <br /> ' laboratory following Chain of Custody protocol <br /> 4.0 BENCH SCALE TEST LABORATORY <br /> The soil and water samples will be sent to the SECOR International Inc The work plan from <br /> SECOR is appended in Appendix B with cost table for the bench scale study <br /> 4.1. Soil Laboratory Analyses <br /> SECOR International Inc will analyze the soil samples and will prepare a study report <br /> evaluating the data in light of the objectives stated in work plan (Appendix B). <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.