Laserfiche WebLink
Ceologua[Teckrucsl Page 3 <br /> Work Plan <br /> George's Service <br /> Project No 425 2 <br /> August 16,2004 w <br /> 1 <br />' 5.0 BENCH SCALE TEST STUDY REPORT <br /> Geological Technics Inc will prepare and submit the bench scale study report within 3 weeks <br /> after receiving the laboratory analysis from the lab The report will include the findings from <br /> the bench scale study and recommendations for pilot testing, and other necessary information <br /> Dr Ray Kablanow, a registered geologist, will supervise this project Copies of the report <br /> will be forwarded to both the appropriate County and State regulatory agencies (SCDER and <br />' CVRWQCB) <br /> t6.0 SIGNATURE AND CERTIFICATION <br /> f <br /> ' This project will be performed by Geological Technics Inc in accordance with accepted <br /> geologic and hydrologic standards of the State of California accepted and in effect at the time <br /> of this investigation Geological Technics Inc is not responsible for undisclosed conditions <br /> 1 <br /> This work plan was prepared by- <br /> Mandeep Singh <br /> Project Engineer <br /> U -J-e i <br /> ' Raynold I Kablanow II, Ph D <br /> California Registered Geologist#5234 <br /> Certified Hydrogeologrst#442 <br /> 1 <br />