My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DURHAM FERRY
>
4491
>
3500 - Local Oversight Program
>
PR0544625
>
SITE INFORMATION AND CORRESPONDENCE FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2019 8:12:28 PM
Creation date
7/3/2019 4:20:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0544625
PE
3528
FACILITY_ID
FA0003113
FACILITY_NAME
ZAPIEN MARKET
STREET_NUMBER
4491
Direction
W
STREET_NAME
DURHAM FERRY
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25504003
CURRENT_STATUS
02
SITE_LOCATION
4491 W DURHAM FERRY RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
410
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOV 04 '94 11:39AM CLE-PRWATER GROUP <br /> CLEARWATER <br /> Ms. Leah S. Goldberg November 4, 1994 <br /> Neumiller & Beardslee <br /> P. O.Drawer 20 VIA FAX <br /> Stockton, California 95201-9978 <br /> Re: Ruiz Grocery, Tracy <br /> Dear Ms. Goldberg, <br /> As we discussed the other day, I have completed my review of the documents <br /> related to the referenced project, and have prepared a cost estimate for the <br /> completion of additional field activities. The majority of the proposed scope is <br /> consistent with that outlined previously by RESNA. There are, however, selected <br /> modifications that I believe will benefit the remedial planning process. These <br /> modifications, and their relationship to the original scope, are listed as follows: <br /> Task 1) Workplan Preparation <br /> Involves the preparation of a succint letter to San Joaquin County outlining the <br /> planned course of action. Also includes costs for permitting. <br /> Task 2) Test Well Installation <br /> The RESNA scope of work called for the installation of three vapor extraction wells <br /> and a single groundwater extraction well, followed by the completion of aquifer and <br /> vadose zone testing. As we discussed the other day, the groundwater extraction well <br /> was never installed. Clearwater recommends the installation of this well and the <br /> completion of the aquifer test as planned. It is also re-commended, however, that <br /> two air sparging wells be installed, and that an air sparging test be completed <br /> following the corr�pletion of the pumping;vapor extraction testing. It is anticipated <br /> that air sparging would be an eventual (if not initial) component of the remedial <br /> approach to be taken at this site, and as such should be evaluated during this field <br /> testing phase of activity. Costs associated with well installation would be <br /> minimized due to the planned installation of the groundwater extraction well (all <br /> wells could be installed in a single day). <br /> Task 3) ,AquiferNadose Zone Testing <br /> The RESNA scope of work called for the completion of a 24 hour pumping test. The <br /> need for a 24 hour test has not been established. Clearwater recommends the <br /> completion of a 12 hour pumping; test instead, and the application of the balance of <br /> these hours to the completion of the vapor extraction test (six hours) and an air <br /> sparging test (six hours). As with the RESNA cost estimate, costs shown on <br /> Attachment A do not include soil or water disposal fees. <br /> 1125 Ada do Avenue 9 Suite 102 9 Alameda •CaUbmia+X901 •(51 M,'07-8730 8730•Fax(510)52.3-038 <br />
The URL can be used to link to this page
Your browser does not support the video tag.