Laserfiche WebLink
a - <br /> NOV a4 94 11 =9HM GLF�i?WATER GROUP _ 0.3/5 <br /> CLEARWATER <br /> u l; o U P, i N C. <br /> Task 4) Remedial Action Plan/Design Package <br /> The RIESNA scope included the submittal of both a testing report/conceptual plan of <br /> action and detailed Remedial Action. Plan. Given that the technologies being <br /> considered for implementation at the site are rather common, Clearwater does not <br /> anticipate that the local or regional agencies will require the submittal. of both <br /> documents. Costs attached reflect only ,the preparation of a detailed report of <br /> testing/detailed design (a combination of the two reports recommended by RESNA). <br /> I <br /> Including the cost of the installation of the' groundwater extraction and air sparging <br /> wells, the proposed cost to complete the referenced scope of work is $21,790. The <br /> casts budpted for tne'pxoject to date ft►r the pilot testing,'reporting phase of activity <br /> total $21.,250, gxcludink the installatt6t 6xAragaim .t 1 .. <br /> I hope this infomation is helpful. Please give me a call to discuss after your review. <br /> Sincerely, <br /> Clearwater Group, Inc. <br /> Mark B. Niebanck, R. G. <br /> Opera "ons Manager <br /> r <br />