Laserfiche WebLink
y F t i°R�T <br /> Pete Wilson <br /> Governor <br /> C LEPA (41W 34 <br /> a. <br /> state Water <br /> Resources January 8, 1997 <br /> Central Board <br /> Division of <br /> Clean Water RUIZ GROCERY <br /> Programs 4491 DURHAM FERRY RD W <br /> Mailing Address: TRACY,CA 95376 <br /> P.O.Box 944212 Via Fax/[J.S.Mail <br /> Sacramento,CA (510) 893-$947 Fax <br /> 94244-2120 <br /> 2014 T Street, Dear Mrs. Stella Ruiz: <br /> Suite 130 <br /> Sacramento,CA <br /> 95814 I have recently reviewed your request for a Pre-Approval regarding claim #001697, for the site <br /> (916)227-4307 address of 4491 DURHAM FERRY RD W,TRACY. Based on the submitted work b, S <br /> VE <br /> FAX(916)227-4530 ermit and RFP preparation, and 4 quarters of GW monitoring,prepared y y <br /> our <br /> system design, p <br /> World Wide Web: Consultant,Clearwater Group,Inc., letter dated 11112196,pre-approval has been granted. The <br /> http:llwww.swrcb.ca, costs of$16,082.00 contained in this estimate appear to be reasonable. However until it can be <br /> govl--cwphome/ <br /> fundhome.htm shown that repaving is more cost-effective than a plastic cover to eliminate "short circuits" int e <br /> SVE system this part of the remediation will not be approved. Please make your SVE system <br /> operation bid for only six months. If another six months of operation is required you may submit <br /> another pre-approval request. This estimate will be placed in your file. <br /> You should note that the Reimbursement Request(RR) instructions do not allow for a"lump <br /> sum"type invoice submittal. Standard time and materials presentation accompanied with <br /> subcontractor invoices,work descriptions and materials lists will be required. <br /> Consultant/contractor should submit invoices that are consistent in format with the pre-approved <br /> cost estimate for timely reimbursement. If you can correlate the actual billing to the <br /> bid/estimate, I should be able to do the same. When unforseen changes or additions occur,an <br /> explanation must accompany the RR or those costs may not be reimbursed. Additionally, all <br /> work performed must be approved before commencement and accepted upon completion by the <br /> lead agency to be eligible for reimbursement. Please make sure the consultant/contractor has the <br /> appropriate licenses to perform the work proposed. Fund staff may not consider construction <br /> charges or costs by Unlicensed firms as eligible. <br /> Be sure to use the enclosed USTCF pre-approval form and include a phone number(FAX if <br /> available), mailing address, site address and your Claim#001697 on all correspondence. Please <br /> call if you have any questions, I can be reached at(916)227-4322. <br /> Sincerely, <br /> Ismae Jacobo,Wat Resources tro Engineer <br /> Underground Storage Tank anup Fund <br /> �aw Recycled Paper Our mission is to preserve and enhance the quality of California's water resources,and <br /> ensure their proper allocation and efficient use for the benefit ofpresent and future generations. <br />