Laserfiche WebLink
4491 Durham Ferry <br /> Meeting Summary . <br /> Page 2 <br /> The following schedule was established: <br /> By November 29, 1996, the final design of the proposed system and operation <br /> specifications will be submitted or an update with an agreeable extension will be <br /> provided. <br /> The system design and operation specifications will then be sent out to bid. By <br /> January 2, 1997, a pre-approval cleanup fund package will be forwarded to State <br /> Water Resources Control Board staff for review and approval. By February 2, 1996, <br /> the contractor should be selected and within three months following, the system <br /> will be constructed and operational. <br /> PHS/EHD stressed the importance of initiating remediation efforts so that the threat to the <br /> domestic well, serving nearby residences can be reduced and eliminated. <br /> Please feel free to contact me at (209) 468-0337. <br /> Donna Heran, REHS, Director <br /> Environmental Health Division <br /> Mary Meays, Senior RTES Margare Lagorio, REHS <br /> Site Mitigation Unit Supervisor <br /> MM14491 DAN <br /> cc: Elizabeth Thayer, CVRWQCB <br /> cc: SWRCB-Cleanup Fund Program <br /> cc: Brian Gwinn, Clearwater <br /> cc: Brook Birkie, Neumiller and Beardslee <br />