My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0006547
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DURHAM FERRY
>
4491
>
3500 - Local Oversight Program
>
PR0544625
>
ARCHIVED REPORTS XR0006547
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2019 8:07:46 PM
Creation date
7/3/2019 4:43:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006547
RECORD_ID
PR0544625
PE
3528
FACILITY_ID
FA0003113
FACILITY_NAME
ZAPIEN MARKET
STREET_NUMBER
4491
Direction
W
STREET_NAME
DURHAM FERRY
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25504003
CURRENT_STATUS
02
SITE_LOCATION
4491 W DURHAM FERRY RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
--��> Z�L< <br /> CLEARWATER <br /> iG R o U P, I N C <br /> r <br /> Environmenial Services <br /> Ms Lori Duncan May 24,2000 <br /> San Joaquin County Public Health Services / Environmental Health Division <br /> 304 East Weber Avenue <br /> Stockton, CA 95202 <br /> Groundwater Monitoring Report- Second Quarter 2000 <br /> Ruiz Grocery, 4491 West Durham Ferry Road, Tracy, CA <br /> Dear Ms Duncan, <br /> Introduction <br /> This report, prepared by Clearwater Group (Clearwater) on behalf of Mrs Stella Ruiz, presents the <br /> results of second quarter 2000 groundwater monitoring activities at Ruiz Grocery, 4491 West Durham <br /> Ferry Road, Tracy, California (Figure 1) This sampling event is the third quarter of verification <br /> monitoring following soil vapor extraction (SVE) system shut-down At the verbal request of Ms <br /> Duncan, one more sampling event will follow, the third quarter 2000 event, to make a total of four <br /> quarters of monitoring following system shut-down <br /> Background <br /> Two gasoline USTs and dispensers were removed from the site in 1988 Seven monitoring wells (MW- <br /> 1 through MW-7), one groundwater recovery well (RW-1), four soil vapor extraction wells (VW-1 <br /> through VW-4), and two air sparge wells (SW-1 and SW-2) have been installed at the site A domestic <br /> well (DW), screened in a deeper water bearing zone, also exists at the site The extent of soil and Nater <br /> contamination was delineated Based on historical investigation data, it was calculated that <br /> approximately 5,050 lbs (842 gals) of gasoline contaminants were present in the vadose zone prior to <br /> remediation Based on cumulative site data, Clearwater recommended construction of a remediation <br /> system consisting of combined groundwater and soil vapor extraction with air sparging The results of <br /> this work were presented in Clearwater's Problem Assessment Report, Feasibility Study, and Remedial <br /> Action Plan dated February 21, 1996 <br /> Following further discussion with the SJCPHS/EHD, Clearwater submitted a Revised Remedial Action <br /> Plan dated November 12, 1996, which recommended remediation by only soil vapor extraction and air <br /> sparging The SJCPHS/EHD approved this plan in a letter dated November 6, 1996 <br /> 520 Third Street,Suite 104 o Oakland,California 94607 o Telephone 510-893-5160 o Fax 510-893-5947 <br />
The URL can be used to link to this page
Your browser does not support the video tag.