Laserfiche WebLink
r <br /> Messrs Trommer and Limon 16 June 2008 <br /> Preliminary Five-Year Review Letters Page 5 of 7 <br /> Various Sites <br /> 1201 Center Street S. <br /> • The CUF recommends reducing the monitoring frequency and implementation of <br /> active remediation without delay; the EHD agrees with these recommendations. <br /> The EHD recently approved the remedial action plan, the SVE and IAS wells <br /> have been installed and the remediation system is under construction; the permit <br /> to operate is still needed from the SJVUAPCD. <br /> 1245 Charter Way, W. (designated 1245 Equipment Way on the preliminary five-year <br /> review letter) <br /> • The CUF recommends the EHD direct with enforcement if necessary, <br /> implementation of the approved work plan without delay; the EHD does not fully <br /> agree with these recommendations. A revised and updated site conceptual <br /> model (SCM) has been received, but not yet reviewed; upon review the EHD will <br /> issue directives as appropriate. The previous SCM was inadequate due to <br /> concentration unit error and lack of plume delineation; the new SCM should <br /> address these issues. Remediation of this site is problematic as much of the <br /> sorbed contamination is in fine-grained soil in the saturated zone. <br /> 1250 Wilson Way, N. <br /> • The CUF recommended that the EHD direct assessment of groundwater <br /> remedial technologies and implementation of active groundwater remediation. <br /> The EHD agrees with this recommendation. <br /> 1403 Country Club Blvd. <br /> • The CUF recommended continued active remediation and maximizing it as <br /> necessary; the EHD agrees with this recommendation. <br /> 1501 Charter Way, W. <br /> • The CUF agreed with EHD directives. The EHD is waiting for a report on the <br /> recent bench-scale test and for a report of findings from a recent soil boring. <br /> 1717 Center Street, S. <br /> • The CUF agreed with recent EHD directives. A report on the recent installation of <br /> monitoring wells is pending. <br /> 1876 Country Club Blvd. <br /> • The CUF recommended that the EHD direct continued groundwater extraction <br /> and treatment and initiate additional groundwater treatment technologies. The <br /> EHD agrees in general with these recommendations, but the EHD believes that <br /> the progress of the current remedial effort should be monitored for a while before <br /> directing additional remedial actions. <br /> 2151 Country Club Blvd. <br /> • The CUF recommended assessment of remedial technologies and <br /> implementation of active remediation without delay; the EHD agrees with this <br /> recommendation and will direct interim remediation. <br /> 5-Year Review Comment Letter 061608.doc <br />