Laserfiche WebLink
F <br /> f <br />{ <br /> 1 <br /> i4 <br /> drilling and sampling procedures, and include the analytical results, a site map showing <br /> 1 the boring location and other relevant site features. The report will also include an <br /> interpretation of the results and provide recommendations. <br /> PROJECT SCHEDULE <br /> Stratus anticipates that field activities can begin approximately one week following the <br /> receipt of the drilling permit. Analytical results will be received approximately 2 weeks <br /> after samples have been submitted for chemical analysis. The investigation report will be <br /> submitted approximately 1 week after receipt of the certified analytical reports. <br /> If you have any questions regarding this work:plan or any other aspect of the project, <br /> please contact me at (530) 925-1992. <br /> Sincerely, <br /> ST /anager <br /> ay . <br /> Pr je <br /> Attachment: Figure 1 Site Vicinity Map <br /> Figure 2 Generalized Site Plan ' <br /> Appendix A Field Methods and Procedures <br /> Teichert-work plan 3 <br />