Laserfiche WebLink
' 8 IMPLEMENTATION ACTIVITIES AND SCHEDULE <br /> 1 Implementation activities for the proposed remediation system include <br /> preparing the soil vapor extraction and abatement system design and <br /> specifications, obtaining permits required to construct and operate the <br /> system, constructing the system, and starting up the system. <br />' Implementation of the recommended remediation activities will begin <br /> immediately after receiving authorization from the San Joaquin County <br /> Environmental Health Division to implement the proposed remediation. <br />' Figure 4 is a proposed implementation schedule, assuming approval for <br /> implementation is received by December 15, 1992. <br /> 1 <br /> pj010f9010f900020.1 ag g - 1 Rev. 0 December 15, 1992 <br />