My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0006864
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
E
>
103
>
3500 - Local Oversight Program
>
PR0544638
>
ARCHIVED REPORTS XR0006864
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2019 3:04:11 PM
Creation date
7/9/2019 1:51:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006864
RECORD_ID
PR0544638
PE
3528
FACILITY_ID
FA0004027
FACILITY_NAME
HENDRIX FORK LIFT INC
STREET_NUMBER
103
Direction
N
STREET_NAME
E
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15318001
CURRENT_STATUS
02
SITE_LOCATION
103 N E ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 PROPOSED CLEANUP N P OBJECTIVES <br />' <br /> Two cleanup objectives are proposed for the remediation. The first <br />' objective is to reduce the petroleum hydrocarbon concentrations in the soil <br /> to below that which would represent a continuing threat to impact underlying <br /> ground water. The cleanup level for the petroleum compounds detected will <br />' be developed using a cost-benefit analysis. <br /> Based on the cost-benefit analysis results, selected samples from <br /> exploratory soil borings drilled to first-encountered ground water will be <br />' analyzed to verify the level of soil remediation. The verification samples will <br /> be analyzed for TPHG, TPHG, and BTEX. <br /> Before the exploratory soil borings are drilled and sampled, EMCON <br /> Associates will prepare for regulatory review and comment, a work plan <br /> describing the location and rationale for the exploratory soil boring locations. <br />' Also included in the work plan will be a description of the drilling and <br /> sampling methods and the rationale for selecting the soil samples for <br /> chemical analysis. <br /> The second cleanup objective will be to reduce petroleum hydrocarbon <br /> concentrations in the ground water to below detectable concentrations. The <br />' level of ground-water remediation will be verified by the analytical results <br /> from the quarterly monitoring. The feasibility of this second objective may <br /> be re-evaluated later during the course of remediation implementation. <br /> I, <br /> i <br /> 15 1992 <br />' pjOlOf9010f900020.1 ag 10 - 1 Rev. 0 December , <br />
The URL can be used to link to this page
Your browser does not support the video tag.