Laserfiche WebLink
• Pile No 3312-44 <br /> 12 January 1995 <br /> Page 2 <br /> Well Reconstruction <br /> Groundwater monitoring well MW-13 was reconstructed to function as a soil vapor extraction well This <br /> involved drilled out the old well, grouting the bottom of the bore hole,and placing the screened interval above <br /> the current groundwater elevation <br /> The well was drilled out on December 29, 1994 The new well was constructed on December 30, 1994 <br /> Attached is a well construction figure showing the well construction details <br /> Please call if you have any questions regarding the remediation and monitoring completed during the fourth <br /> quarter 1994 <br /> Sincerely, <br /> ANDERSON CONSULTING GROUP <br /> Mark A ThomasX/ /Environmental <br /> n A Baker, P E <br /> Senior Project Professional Engineering Director <br /> attachment January b, 1995 Anders Consulting Group Letter to the San Joaquin Valley <br /> Unified Air Pollutio Control District <br /> Fourth Quarter 1994 Groundwater Monitoring Report <br /> MW-13 Reconstruction Details <br /> cc George Takemort, A Teichert &Son, Inc <br /> I <br /> i <br /> ANDERSON <br /> r q CONSULTING <br /> V GROUP <br /> u <br />