My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0006967
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
E
>
103
>
3500 - Local Oversight Program
>
PR0544638
>
ARCHIVED REPORTS XR0006967
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2019 3:03:38 PM
Creation date
7/9/2019 2:13:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006967
RECORD_ID
PR0544638
PE
3528
FACILITY_ID
FA0004027
FACILITY_NAME
HENDRIX FORK LIFT INC
STREET_NUMBER
103
Direction
N
STREET_NAME
E
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15318001
CURRENT_STATUS
02
SITE_LOCATION
103 N E ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Harlin Knoll January 25,2002 <br /> Teichert-Site Closure <br /> Page 2 <br /> approximately 65 feet bgs. On December 30, 1994, Spectrum Exploration Services <br /> returned to the site to drill out boring MW-13 using 10-inch diameter hollow stern augers. <br /> Well MW-13 was re-constructed as a 4-inch diameter vapor extraction well with 30 feet <br /> of 0.02-inch diameter PVC well screen, extending from approximately 35 to 65 feet bgs. <br /> A representative from Anderson Consulting Group was onsite to oversee the drilling and <br /> well construction activities. The reconstruction of well MW-13 was documented in a <br /> Quarterly Monitoring Report submitted by Anderson Consulting Group on January 12, <br /> 1995. A well construction diagram illustrating the construction details of vapor <br /> extraction well MW-13 is provided in Appendix B. The depth and screen interval of well <br /> MW-13 are shown on the revised geologic cross section (Figure 2). <br /> We hope that the information provided is sufficient for further consideration of closure <br /> for this site. Please contact Jay Johnson at 530-676-6000 if you have questions or <br /> comments. <br /> Sincerely, <br /> Stratus Environmental, Inc. <br /> r <br /> Stephen J. C;77a , R.G. IOJj <br /> . J son, R. <br /> Senior Project Supervisor P anager <br /> Attachments: Table Summary of Groundwater Analytical Results <br /> Figure 1 Site Map <br /> Figure 2 Geologic Cross Section A to A' <br /> Appendix A Field Data Sheets <br /> Appendix B Well Construction Diagram <br /> Cc: Mr. George Takemori, A. Teichert & Sons, Inc. <br /> Mr. Marty Hartzell, California Regional Water Quality Control Board <br /> • <br /> P:\Teichert\Stockton-103\Correspondence\Tiechert-2ndletter.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.