My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0006969
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
E
>
103
>
3500 - Local Oversight Program
>
PR0544638
>
ARCHIVED REPORTS XR0006969
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2019 3:06:32 PM
Creation date
7/9/2019 2:14:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006969
RECORD_ID
PR0544638
PE
3528
FACILITY_ID
FA0004027
FACILITY_NAME
HENDRIX FORK LIFT INC
STREET_NUMBER
103
Direction
N
STREET_NAME
E
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15318001
CURRENT_STATUS
02
SITE_LOCATION
103 N E ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STK3 Stockton Cleanup Journal <br /> 103 North E Street <br /> 08-11-88 Triangle removed one 1 OK gal, gasoline tank, C-12. There was minor contamination <br /> around tank fill. LBME applied for permits to continue investigation of contamination. <br /> 08-23-88 LBME submitted proposal to San Joaquin Health Dept. to overexcavate contamination and <br /> backfill hole left by removal of C-12. <br /> 09-29-88 Contaminated soil around 1 OK gal. gasoline tank, C-12 was overexcavated for aeration. <br /> 09-30-88 LBME sampled soil in excavated pit where C-12 was removed. <br /> 10-05-88 LBME sent lab results to San Joaquin Health Dept. for bottom of tank hole where 0-12 <br /> was removed. All samples were clean. <br /> 10-31-88 Baylor's spent 8 hours this month discing soil for aeration. <br /> 11-30-88 Baylor's spent 4 hours this month discing soil for aeration. <br /> 12-31-88 Baylor's spent 3 hours this month discing soil for aeration. <br /> 03-24-89 Baylor's spent 2 hours this month discing soil for aeration. <br /> 04-19-89 LBME sampled remediated soil from excavation on 9-29-88. <br /> 05-21-89 Elder Engineering sent lab test results to San Joaquin Health Dept. for soil over-excavated <br /> on 9-29-88. Soil was remediated and tested clean at 1.4 ppm on 4-19-88. <br /> • 02-09-90 Permits requested on 8-11-88 have still not been issued. During this 18 month period, <br /> the ground water dropped from 35to 62'. Since MW 3, 4, 5 were only 55 they were now <br /> useless. Requested permission to install MW 9, 10 and 11. <br /> 03-20-90 LBME installed three monitoring wells (MW 9, 10, 11). Installation completed on 3-23-90. <br /> MW 9, 10 are 2"wells and MW 11 is a 4"well. <br /> 03-30-90 TPH, toiulene and xylene in MW 9, 10, 11 are below action level. MW 11 showed 1 ppb <br /> of benzene. <br /> 04-24-90 LBME sampled MW 9, 10, 11. MW 11 showed benzene as non-detect. <br /> 03-18-91 Elder Engineering sampled MW 9, 10, 11. <br /> 06-10-91 Elder Engineering sampled MW 9, 10, 11. <br /> 10-15-91 Al Mercer and George Takemori met with Steve Schneider and Margaret Lagorio from San <br /> Joaquin Public Health Services to discuss letters dated 10-10-90, 9-13-91 and <br /> 9-26-91. <br /> 02-03-92 Elder Engineering sampled barreled purge and development water from MW 9, 10, 11. <br /> 08-12-92 EMCON installed MW 12, 13 and 892-1. <br /> 08-24-92 EMCON sampled MW 10, 11, 12 and 13. <br /> • 10-13-92 EMCON performed a soil vapor extraction test on MW 13 and existing vapor extraction <br /> grid. <br />
The URL can be used to link to this page
Your browser does not support the video tag.