My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0006969
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
E
>
103
>
3500 - Local Oversight Program
>
PR0544638
>
ARCHIVED REPORTS XR0006969
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2019 3:06:32 PM
Creation date
7/9/2019 2:14:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006969
RECORD_ID
PR0544638
PE
3528
FACILITY_ID
FA0004027
FACILITY_NAME
HENDRIX FORK LIFT INC
STREET_NUMBER
103
Direction
N
STREET_NAME
E
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15318001
CURRENT_STATUS
02
SITE_LOCATION
103 N E ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> STK3 Stockton Cleanup Journal <br /> 103 North E Street <br /> S <br /> 10-29-92 Linda Turkatte said I could process purge and decon water through recycle system in <br /> Sacramento. <br /> 12-03-92 EMCON sampled MW 10, 11, 12 and 13. <br /> 02-22-93 EMCON sampled MW 10, 11, 12 and 13. <br /> 05-10-93 EMCON sampled MW 10, 11, 12 and 13. <br /> 06-01-93 Linda Turkatte approved disposal of purge water from 12-3-92 and 2-22-93 sampling <br /> events through recycle system in Sacramento. <br /> 07-26-93 EMCON sampled MW 10, 11, 12 and 13. <br /> 08-09-93 Linda Turkatte approved disposal of soil cuttings from MW-13. Linda also requested that <br /> I submit a letter on what I want to do next at Stockton. <br /> 11-24-93 Ramos/BCR sampled MW 10, 11, 12 and 13. <br /> 02-28-94 RamosIBCR sampled MW 10, 11, 12 and 13. <br /> 03-10-94 RamosBCR started drilling MW-14 today. <br /> 03-11-94 Pamos/BCR completed drilling MW-14 today. <br /> • 03-16-94 Ramos/BCR performed a soil vapor extraction test on MW-14. <br /> 07-05-94 Ramos/BCR sampled MW 10, 11, 12 and 14. <br /> 09-19-94 Ramos/BCR sampled MW 9, 10, 11, 12, 13 and 14. <br /> 12-13-94 Started vapor extraction system today extracting from MW 14. <br /> 12-19-94 Anderson sampled MW 10, 11, 12, 13 and 14. <br /> 12-22-94 Anderson collected air samples from MW-14. <br /> 12-29-94 Spectrum reconstructed MW 13 from 90' to 65' deep using 4" casing with 30' of screen for <br /> use as a vapor extraction well. <br /> 01-04-95 Restarted vapor extraction system today extracting from MW 13 and 14. <br /> 01-20-95 Anderson collected air samples from MW 13 and 14. <br /> 02-23-95 Anderson collected air samples from MW 13 and 14. <br /> 03-03-95 Converted vapor extraction unit to catalytic mode. <br /> 03-16-95 Anderson collected air samples from MW 13 and 14, and groundwater sampled MW 10, 11, <br /> 12, and 14. <br /> • 04-14-95 EMCON collected air samples from MW 13 and 14. <br />
The URL can be used to link to this page
Your browser does not support the video tag.