Laserfiche WebLink
r <br /> STK3 Stockton Cleanup Journal <br /> 103 North E Street <br /> S <br /> 10-29-92 Linda Turkatte said I could process purge and decon water through recycle system in <br /> Sacramento. <br /> 12-03-92 EMCON sampled MW 10, 11, 12 and 13. <br /> 02-22-93 EMCON sampled MW 10, 11, 12 and 13. <br /> 05-10-93 EMCON sampled MW 10, 11, 12 and 13. <br /> 06-01-93 Linda Turkatte approved disposal of purge water from 12-3-92 and 2-22-93 sampling <br /> events through recycle system in Sacramento. <br /> 07-26-93 EMCON sampled MW 10, 11, 12 and 13. <br /> 08-09-93 Linda Turkatte approved disposal of soil cuttings from MW-13. Linda also requested that <br /> I submit a letter on what I want to do next at Stockton. <br /> 11-24-93 Ramos/BCR sampled MW 10, 11, 12 and 13. <br /> 02-28-94 RamosIBCR sampled MW 10, 11, 12 and 13. <br /> 03-10-94 RamosBCR started drilling MW-14 today. <br /> 03-11-94 Pamos/BCR completed drilling MW-14 today. <br /> • 03-16-94 Ramos/BCR performed a soil vapor extraction test on MW-14. <br /> 07-05-94 Ramos/BCR sampled MW 10, 11, 12 and 14. <br /> 09-19-94 Ramos/BCR sampled MW 9, 10, 11, 12, 13 and 14. <br /> 12-13-94 Started vapor extraction system today extracting from MW 14. <br /> 12-19-94 Anderson sampled MW 10, 11, 12, 13 and 14. <br /> 12-22-94 Anderson collected air samples from MW-14. <br /> 12-29-94 Spectrum reconstructed MW 13 from 90' to 65' deep using 4" casing with 30' of screen for <br /> use as a vapor extraction well. <br /> 01-04-95 Restarted vapor extraction system today extracting from MW 13 and 14. <br /> 01-20-95 Anderson collected air samples from MW 13 and 14. <br /> 02-23-95 Anderson collected air samples from MW 13 and 14. <br /> 03-03-95 Converted vapor extraction unit to catalytic mode. <br /> 03-16-95 Anderson collected air samples from MW 13 and 14, and groundwater sampled MW 10, 11, <br /> 12, and 14. <br /> • 04-14-95 EMCON collected air samples from MW 13 and 14. <br />