My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EAST
>
2360
>
3500 - Local Oversight Program
>
PR0544639
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2019 4:52:06 PM
Creation date
7/9/2019 2:56:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544639
PE
3528
FACILITY_ID
FA0005076
FACILITY_NAME
DICKS EXXON
STREET_NUMBER
2360
STREET_NAME
EAST
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23346001
CURRENT_STATUS
02
SITE_LOCATION
2360 EAST ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
316
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chronology page 2 <br /> 2360 East Street, Tracy <br /> 01/14/98 Date of the Subsurface Investigation report that discusses the July 1997 work. <br /> 05/23/02 The date of the EHD correspondence notifying the responsible party that their <br /> request for closure (no further action) dated April 5, 2002 was denied. The <br /> ground water plume was not laterally and vertically defined and ground water <br /> concentrations of petroleum exceeded acceptable levels for closure. <br /> 07119-20105 Two cone pentrometer borings SB12D and SB13D and three push point borings <br /> SB14 — SB16 were completed during this time. <br /> 07/05/06 The date the EHD received Ground Zero Analysis Inc's, Investigation Summary <br /> ReportlSite Conceptual Model (SCM) dated June 30, 2006 on Geotracker that <br /> includes discussion of the July 2005 work. <br /> 10/12/06 The date of the EHD letter that comments on the SCM and requires further site <br /> investigation. <br /> 01/11/07 Date the responsible party, the EHD and Ground Zero Analysis met to discuss <br /> the site and required work plan. <br /> 09127-28107 Monitoring wells MW4 and MW5 and soil borings SB17-24 were completed <br /> during this time. <br /> 02/22/08 Date of the Subsurface Investigation report that discusses the September 2007 <br /> work. <br /> 01/09/09 The date soil vapor probes SV1—SV8 were installed and vapor samples <br /> collected. <br /> 04/06/09 The date the EHD received Lee & Pierce Inc's Soil Vapor Assessment Summary <br /> Report dated April 1, 2009. <br /> 05/13/09 Date of EHD letter requesting submittal of a closure report. <br /> 05/20/09 The date the EHD discusses site closure with Central Valley Regional Water <br /> Quality Control Board. <br /> 08/31/09 The date the EHD received Lee & Peirce Inc's Closure Request dated August <br /> 31, 2009 on Geotracker. <br /> 10/05/09 The date the EHD sends NFA Case Closure Summary, Chronology, and 30-day <br /> Notice letter to the CVRWQCB. <br /> 10/20/09 The date the EHD receives the CVRWQCB concurrence to NFA letter. <br /> 10/21/09 The date the EHD notifies RPs consultant that a work plan for monitoring well <br /> destructions should be submitted. <br />
The URL can be used to link to this page
Your browser does not support the video tag.