Laserfiche WebLink
ENVIRONMENTAL HEALTH bEPARTMENT <br /> SAN JOAQUIN COUNTY <br /> z' <br /> �> �, Donna K. Heron, R.E.H.S. Program Coordinators <br /> ":. Director 304 East Weber Avenue,Third Floor Carl Borgman, R.E.H.S. <br /> Laurie A. Cotulla, R.E.H.S. Stockton,California 95202-2708 Mike Huggins, R.E.H.S., R.D.I. <br /> Assistant DirectorMargaret Lagorio, R.E.H.S. <br /> PQ;iFp'R��P Telephone: (209)468-3420 <br /> Robert McClellon, R.E.H.S. <br /> Fax: (209)464-0138 Jeff Carruesco, R.E.H,S. <br /> Website:www.sjgov.org/chd/ Kasey Foley, R.E.H.S. <br /> JOHN PESTANA Q-TIP TRUST <br /> DONALD PETERSON <br /> PO BOX 672 <br /> MANTECA CA 95336 <br /> Re: Former Reeve's Exxon Site Code: 1397 <br /> 2360 East Street ROM 200 <br /> Tracy, CA 95376 SWRCB-CUF#: 3484 <br /> WORKPLAN: Work Plan for Additional Subsurface Investigation <br /> DATED: February 13, 2007 <br /> PREPARED. BY: Ground Zero Analysis, Inc. — John Lane, PG. <br /> STATUS: Disapproved. <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORKPLAN rHealth & Safety <br /> Code H&5 Section 25296.1 0 c 3 : <br /> • Work plan is inadequate and does not include requirements established in the <br /> EHD/responsible party meeting held January 11, 2007 as listed in the EHD <br /> January 23, 2007 letter. <br /> COMMENTS AND CONDITIONS: <br /> • Work plan revision is required and due at the EHD by March 30, 2007 and shall <br /> include the City of Tracy encroachment permit and three (3) EHD Well Permit <br /> Application Forms and a $374 application fee for each. <br /> REASONS FOR DISAPPROVAL OF THE WORKPLAN fH&S Section 25296.10(c)(3)1: <br /> • The EHD January 23, 2007 correspondence required "a discussion of the status <br /> and details of any active or inactive petroleum pipelines in Grantline Road"and <br /> one soil boring east of the former UST area in the shopping center parking lot" <br /> These items were not included in the work plan. <br /> • Provide a discussion of the pipeline status in Grantline Road to the EHD by <br /> March 30, 2007 and add the missing soil boring in the revised work plan. The <br /> soil boring is to be 25-20 feet east of former soil boring "SB-11° and is to have <br /> soil and ground water grab samples analyzed for TPHho, TOG, and TPHd, as <br /> well as all waste oil UST protocols. <br /> DATED: March 14, 2007 BY ✓6 <br /> ��� i,�— <br /> Michael Infurna, RE . (209) 468-Y4-54 <br /> cc: CVRWQCB — James L. Barton, Sacramento. <br /> SWRCB — CUF — Mark Owens, Sacramento. <br /> Ground Zero Analysis -- J. Lane, 1714 Main St, Escalon 95320 <br /> [X]electronically transmitted to consultant on: March 14,2007 <br />