Laserfiche WebLink
0 0 1 <br /> Ground Zero Analysis, Inc. <br /> i <br /> SITE SAFETY PLAN <br /> Job Name Pestana Reeves <br /> Job Location. 2360 East Street, Tracy, CA <br /> Client Name: John Pestana QTIP Trust <br /> Project Number- 95-036 <br /> General Work Description. Hand Auger and soil sampling to define current subsurface conditions <br /> in soil and differentiate potential off site sources of soil contamination. <br /> SSP Prepared by: John Lane <br /> On-site Safety Officer Anthony Scoma/Jeanne Buckthal <br /> Project Safety Officer John Lane <br /> • This site safety and health plan (SSP) must be kept on-site and accessible to all on-site employees <br /> during all phases of site operations The SSP must be reviewed and signed by all on-site <br /> employees, subcontractors, and visitors prior to entering the site <br /> The provisions set-forth in this SSP shall apply to GZA employees and any subcontractors worlang <br /> for GZA at the Job site All personnel worlang for GZA at the Job site must read this SSP, and sign <br /> the attached Compliance Agreement before entering the work area Field personnel may deviate <br /> from the safety provisions set-forth m this SSP, but only to upgrade or increase the safety <br /> requirements GZA personnel may suspend work if unsafe working conditions are identified or <br /> observed, or unauthorized modifications to the safety provisions set-forth in thus SSP are made If <br /> changes in site or worhang conditions require changes in safety procedures, appropriate <br /> amendments to this SSP will be provided by the GZA project manager or supervisor, with the <br /> written approval of the GZA Health and Safety Director <br /> PAGE i <br />