Laserfiche WebLink
0 <br /> Monitoring Well Installation Work Plan, Revision 2 <br /> March 25, 2008 <br /> Page 5 of 5 <br /> SCHEDULE <br /> Initiation of field work is subject to driller availability. We anticipate being able to begin fieldwork <br /> within four to six weeks of authorization to proceed. The fieldwork will require approximately four <br /> weeks to complete. Another approximate four-week period will be required to complete the <br /> laboratory analysis and reporting. <br /> BUDGET <br /> Total costs for installing two and three wells are estimated at $82,233 and $111,961 respectively. <br /> Actual project costs will be incurred and invoiced on a time-and-materials basis. This cost estimate <br /> is applicable as long as the work is authorized within six weeks. <br /> If you have any questions regarding the information contained within this Work Plan, please do not <br /> hesitate to contact Rob Gailey. <br /> Sincerely, <br /> The Source Group,Inc.v� <br /> Jon R. Philipp, P.G., C.HG. <br /> Senior Hydrogeologist <br /> 4�v /" �� <br /> Robert M. Gailey, P.G., C.HG. <br /> Principal Hydrogeologist <br /> The Source Group,Inc. <br />