Laserfiche WebLink
CROSS REFERENCE MATRIX FOR NON-PRODUCTION FACILITIES <br /> Applicable? Page <br /> Regulation Yes No Description No. <br /> §112.3(b)(1)or(c) ® ❑ SPCC Plan prepared prior to facility becoming operational ii <br /> (effective 11/10/2010) <br /> §112.3(d) ® ❑ Professional Engineer(PE)certification with five <br /> elements <br /> §112.5(a) ® ❑ Amendment of SPCC Plan <br /> §112.5(b) ❑ ❑ Review of Plan at least every 5 years with documentation <br /> (i.e. a log) <br /> §112.6 ❑ ® Qualified Facilities:Qualification criteria 1 <br /> §112.6(a)or(b) ❑ ❑ Tier I or Tier 11 Self Certification with eight elements - <br /> §112.6(a)(2) ❑ ® Technical amendments self-certified - <br /> §112.6(a)(3)(i) ❑ ® Template has failure analysis - <br /> §112.6(a)(3)(ii) ❑ ® Template has adequate secondary containment - <br /> §112.6(a)(3)(iii) ❑ ® Template has overfill protection - <br /> §112.6(b)(2)(i) ❑ ® Technical amendment Self-Certified or PE certification <br /> for deviations from Plan requirements <br /> §112.6(c)(3)(i) ❑ ❑ Environmental Equivalence certified by PE - <br /> §112.6(c)(3)(ii) ❑ ❑ Impracticability determination certified by PE - <br /> §112.6(c)(4) ❑ ® PE certification with three elements - <br /> ® ❑ General requirements for SPCC Plans for all facilities& 1 <br /> all oil types <br /> §112.7 ® ❑ Management approval of Plan I <br /> Discussion of facilities,procedures,methods or <br /> ❑ ® equipment not yet fully operational with details of - <br /> installation and operational start-up <br /> §112.7(a)(1) ❑ ❑ General requirements;discussion of facility's 1 <br /> conformance with rule requirements <br /> §112.7(a)(2) ❑ ® Deviations from Plan requirements - <br /> Facility description and diagram,type of oil and <br /> §112.7(a)(3)(i) ® ❑ capacity of each container,transfer stations and piping, 2 <br /> buried containers on diagram <br /> §112.7(a)(3)(ii) ❑ ❑ Discharge prevention measures 2 <br /> §112.7(a)(3)(iii) ❑ ❑ Discharge drainage controls 2 <br /> §112.7(a)(3)(iv) ® ❑ Countermeasures for discharge discovery,response and 4 <br /> cleanup <br />