My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEISS
>
1512
>
2800 - Aboveground Petroleum Storage Program
>
PR0516194
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 11:33:23 AM
Creation date
7/10/2019 8:49:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0516194
PE
2832
FACILITY_ID
FA0009167
FACILITY_NAME
VALLEY PACIFIC PETROLEUM ESCALON
STREET_NUMBER
1512
STREET_NAME
WEISS
STREET_TYPE
WAY
City
ESCALON
Zip
95320
APN
22708001
CURRENT_STATUS
01
SITE_LOCATION
1512 WEISS WAY
P_LOCATION
06
P_DISTRICT
005
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CROSS REFERENCE MATRIX FOR NON-PRODUCTION FACILITIES <br /> _V1 No. <br /> Applicable? Page <br /> Regulation Description <br /> Yes No <br /> §112.7(a)(3)(v) ® ❑ Methods of disposal of recovered materials in 4 <br /> accordance with legal requirements <br /> Contact list and phone numbers for facility emergency <br /> §112.7(a)(3)(vi) ❑ ❑ coordinator,National Response Center,cleanup 5 <br /> contractors,all Federal,State,and local agencies who <br /> must be contacted in case of a discharge <br /> §112.7(a)(4) ® ❑ Spill reporting information 5 <br /> §112.7(a)(5) ® ❑ Spill Response 6 <br /> §112.7(b) ® ❑ Failure prediction(sources,quantities,rates,and 6 <br /> directions) <br /> Secondary containment for all areas from which a <br /> §112.7(c)(1) ® ❑ discharge of oil could occur(i.e.mobile refuelers, 7 <br /> loading/unloading areas,transformers,oil filled <br /> operational equipment,etc.) other than bulk containers <br /> §112.7(d) ® ❑ Aboveground tanks integrity inspections 8 <br /> §112.7(d)(1) ❑ ❑ Oil spill contingency plan per part 109 9 <br /> §112.7(d)(2) ® ❑ Commitment of manpower,equipment&materials to 9 <br /> remove a discharge <br /> ® ❑ Written procedures for inspections and tests 10 <br /> §112.7(e) <br /> ® ❑ Records of inspections and tests signed and kept 3 years 10 <br /> §112.7(f)(1) ❑ ❑ Employee training 10 <br /> §112.7(f)(2) ® ❑ Designated individual accountable for discharge 10 <br /> §112.7(f)(3) ® ❑ Discharge prevention briefings scheduled and conducted 10 <br /> annually <br /> ® ❑ Security: How oil handling,processing and storage 10 <br /> areas are secured and access is controlled <br /> ❑ ❑ Security: How master flow and drain valves of 10 <br /> containers are secured <br /> §112.7(g) <br /> ® ❑ Security: How unauthorized access to starter controls on 10 <br /> oil pumps is prevented <br /> ® ❑ Security: How out-of-service and loading/unloading 10 <br /> connections of oil pipelines are secured <br /> Security: Appropriateness of security lighting to both <br /> §112.7(g) ® ❑ prevent acts of vandalism and assist in the discovery of 10 <br /> oil discharges is addressed <br />
The URL can be used to link to this page
Your browser does not support the video tag.