My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEISS
>
1512
>
2800 - Aboveground Petroleum Storage Program
>
PR0516194
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 11:33:23 AM
Creation date
7/10/2019 8:49:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0516194
PE
2832
FACILITY_ID
FA0009167
FACILITY_NAME
VALLEY PACIFIC PETROLEUM ESCALON
STREET_NUMBER
1512
STREET_NAME
WEISS
STREET_TYPE
WAY
City
ESCALON
Zip
95320
APN
22708001
CURRENT_STATUS
01
SITE_LOCATION
1512 WEISS WAY
P_LOCATION
06
P_DISTRICT
005
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CROSS REFERENCE MATRIX FOR NON-PRODUCTION FACILITIES <br /> Applicable? <br /> Regulation Description Page <br /> Yes No <br /> §112.7(h) ® ❑ Loading/unloading rack(excluding offshore facilities) 10 <br /> §112.7(h)(1) ® ❑ Containment for contents of largest compartment 10 <br /> Warning light/sign,barrier system,wheel chocks,or <br /> §112.7(h)(2) ® ❑ break interlock system to prevent departure with 10 <br /> connected lines <br /> §112.7(h)(3) ® ❑ Inspect drains and outlets of vehicles 10 <br /> §112.7(i) ❑ ® Brittle fracture or catastrophic failure evaluation 11 <br /> requirements <br /> §112.70) ® ❑ Conformance with State requirements 11 <br /> §112.7(k)(1) ❑ ® Qualified Oil-Filled Operational Equipment: Meets 12 <br /> criteria <br /> §112.7(k)(2)(i) ❑ ® Inspection procedures or monitoring program 12 <br /> §112.7(k)(2)(ii)(a) ❑ ❑ Oil spill contingency plan per part 109 12 <br /> §112.7(k)(2)(ii)(b) ❑ ® Written commitment of resources 12 <br /> §112.8 ® ❑ Requirements for Onshore Facilities(excluding 12 <br /> production) <br /> §112.8(a) ® ❑ Meet general and specific requirements 12 <br /> §112.8(b)(1) ® ❑ Facility drainage: Restrain drainage from diked areas; 12 <br /> inspect accumulation <br /> §112.8(b)(2) ❑ ❑ Facility drainage: Manual valves to drain diked areas, 12 <br /> watercourse <br /> §112.8(b)(3) ❑ ❑ Facility drainage: Undiked drainage with a potential for 12 <br /> a designed flow to ponds,lagoons,or catchment basins <br /> §112.8(b)(4) ® ❑ Facility drainage: Final discharge of ditch drainage 12 <br /> controlled <br /> §112.8(b)(5) ❑ ® Facility drainage: Where pump transfer is needed,two 12 <br /> lift pumps installed with one installed permanently <br /> §112.8(c) ® ❑ Bulk storage containers: 12 <br /> §112.8(c)(1) ® ❑ Containers compatible with material and conditions of 12 <br /> storage <br /> Secondary containment for capacity of largest container <br /> §112.8(c)(2) ® El Secondary <br /> &sufficient freeboard for precipitation <br />
The URL can be used to link to this page
Your browser does not support the video tag.