Laserfiche WebLink
G TP �- <br /> STI SP001 Annual inspection Checklist <br /> General Inspection Information : <br /> Inspection Date: Retain Until Date: <br /> X �(36 months from inspection date) <br /> PrinrIncr+ontin., D ..t., <br /> .. - V Inspector Name: <br /> Tanks Inspected (iD #'s): <br /> Inspection Guidance . <br /> For equipment not included in this standard , follow the manufacturer recommended inspection/testing schedules and procedures . <br /> The periodic AST inspection is intended for monitoring the external AST condition and its containment structure. This visual inspection does not require a certified <br /> inspector. It shall be performed by an owner's inspector who is familiar with the site and can identify changes and developing problems, <br /> > Inspect the AST shelf and associated piping, valves, and pumps including inspection of the coating for Paint Failure. <br /> r Inspect: <br /> 1 . Earthen containment structures including examination for holes, washout, and cracking in addition to liner degradation and tank settling . <br /> 2 . Concrete containment structures and tank foundations/supports including examination for holes, washout, settling , paint failure, in addition to examination for <br /> corrosion and leakage. <br /> 3. Steel containment structures and tank foundations/suppbrts including examination for washout, settling, cracking , and for paint failure, in addition to <br /> 4. examination for corrosion and leakage. <br /> Inspection of cathodic protection system, if applicable, includes the wire connections for galvanic systems and visual inspection of the operational components <br /> (power switch , meters , and alarms) of impressed current systems . <br /> Remove promptly upon discovery standing water or liquid in the primary tank , secondary containment area, interstice, or spill container. Before discharge to the <br /> environment, inspect the liquid for regulated products or other contaminants and disposed of it properly. <br /> In order to comply with EPA SPCC (Spill Prevention , Control and Countermeasure) rules , a facility must regularly test liquid level sensing devices to ensure proper <br /> operation (40 CFR 112 .8(c)(8) (v)). <br /> ( ) designates an item in a non-conformance status. This indicates that action is required to address a problem . <br /> Nan-conforming items important to tank or containment integrity require evaluation by an engineer experienced in AST design , a certified inspector, or a tank <br /> manufacturer who will determine the corrective action . Note the non-conformance and corresponding corrective action in the comment section . <br /> r Retain the completed checklists for 36 months. <br /> Complete this checklist on an annual basis supplemental to the owner monthly-performed inspection checklists . <br /> Mote : If a change has occurred to the tank system or containment that may affect the SPCC plan, the condition should be evaluated against the current <br /> plan requirement by a Professional Engineer knowledgeable in SPCC development and implementation , <br /> AST INSPECTION STANDARD 31 <br /> Jut.v 2006 <br />