Laserfiche WebLink
STI SPOO1 Annual lnmecti © n Checklist <br /> General ins ection Information ; <br /> inspection Date: _ _ � 1 Retain Until Date: 7 "' —� , <br /> __-�- (36 months from inspection date) <br /> Prin_ r Inenr�nH..n r %^4... <br /> " "'""" Ins _clot N , e ; <br /> Tanks inspected (ID #'s): +� <br /> inspection Guidance . <br /> For equipment not included in this standard, follow the manufacturer recommended inspectionitesting schedules and procedures . <br /> The periodic AST Inspection is intended for monitoring the external AST condition and its containment structure. This visual inspection does not require a certi ted <br /> inspector. it shall be performed by an owner's inspector who is familiar with the site and can identify changes and developing problems. <br /> Inspect the AST shell and associated piping, valves, and pumps including inspection of the coating for Paint Failure. <br /> "r Inspect: <br /> 1 , Earthen containment structures including examination for holes, washout, and cracking in addition to liner degradation and tank settling . <br /> 2. Concrete containment structures and tank foundations/supports including examination for hates, washout, settling, paint failure, in addition to examination for <br /> corrosion and leakage. <br /> 3. Steel containment structures and tank foundations/supports including examination for washout, settling, cracking , and for paint failure, in addition to <br /> examination for corrosion and leakage. <br /> inspection of cathodic protection system, if applicable, includes the wire connections for galvanic systems and visual inspection of the operational components <br /> (power switch, meters, and alarms) of impressed current systems . <br /> Remove promptly upon discovery standing water or liquid in the primary tank, secondary containment area, interstice, or spill container. Before discharge to the <br /> environment, inspect the liquid for regulated products or other contaminants and disposed of it properly. <br /> � ln order to comply with EPA SPCC (Spill Prevention, Control and Countermeasure) rules , a facility must regularly test liquid level sensing devices to ensure proper <br /> operation (40 CFR 112.8(c)(8)(v)). <br /> (') designates an item in a non-conformance status. This indicates that action is required to address a problem . <br /> r Nan-conforming items important to tank or containment integrity require evaluation by an engineer experienced in AST design , a certified inspector, or a tank <br /> manufacturer who will determine the corrective action. Note the non-conformance and corresponding corrective action in the comment section . <br /> 'r Retain the completed checklists for 36 months. <br /> r Complete this checklist on an annual basis supplemental to the owner monthly-performed inspection checklists. <br /> Note : If a change has occurred to the tank system or containment that may affect the SPCC plan, the condition should be evaluated against the current <br /> plan requirement by a Professional Engineer knowledgeable in SPCC development and implementation. <br /> AST INSPECTION STANDARD 31 <br /> JULY 2006 <br />