Laserfiche WebLink
STI SPp001 Annual Ins ection Checklist <br /> General Inspection Information ; <br /> Inspection Date: r _ r- <br /> Retain Until Date: <br /> / (36 months from inspection date) <br /> Prinr Inenanlinn n .,,,, . <br /> Inspector Nave ; <br /> Tanks Inspected (10 #'s): (////J <br /> Lk C? � n [ -� <br /> inspection Guidance : <br /> i For equipment not included in this standard , follow the manufacturer recommended inspection/testing schedules and procedures . <br /> The periodic AST inspection is intended for monitoring the external AST condition and its containment structure. This visual inspection does not require a certified <br /> inspector. It shall be performed by an owner's inspector who is familiar with the site and can identify changes and developing <br /> Inspect the AST shelf and associated piping , valves, and pumps including inspection of the coating for Paint Failure. q <br /> "r Inspect: P 9 problems, <br /> 1 . Earthen containment structures including examination for holes, washout, and cracking in addition to liner degradation and tank settling . <br /> 2. Concrete containment structures and tank foundations/supports including examination for holes , washout, settling, <br /> corrosion and leakage. paint failure, in addition to examination for <br /> 3. Steel containment structures and tank foundations/supports including examination for washout, settling, cracking , and for paint failure, in addition to <br /> examination for corrosion and leakage. <br /> Inspection of cathodic protection system , if applicable , includes the wire connections for galvanic systems and visual inspection of the operational component s <br /> (power switch , meters, and alarms) of impressed current systems . <br /> Remove promptly upon discovery standing water or liquid in the primary tank, secondary containment area, interstice, or spill container. Before discharge t <br /> environment, inspect the liquid for regulated products or other contaminants and disposed of it properly. <br /> In order to comply with EPA SPCC (Spill Prevention, Control and Countermeasure ) rules <br /> operation (40 CFR 112. 8 (c)(8) (v)). , a facility must regularly test liquid level sensin device g o the <br /> M designates an item in a non-conformance status. This indicates that action is required to address a problem , g s to ensure proper <br /> Non-conforming items important to tank or containment integrity require evaluation by an engineer experienced in AST design , a certified inspector, or a <br /> manufacturer who will determine the corrective action. Note the non-conformance and corresponding corrective action in the comment section . <br /> r Retain the completed checklists for 36 months. P tank <br /> r Complete this checklist on an annual basis supplemental to the owner monthly-performed inspection checklists. <br /> Note : If a change has occurred to the tank system or containment that may affect the SPCC plan, the condition should be evaluated against the current <br /> plan requirement by a Professional Engineer knowledgeable in SPCC development and implementation . <br /> t ., <br /> tS t . t k� & t B • <br /> AST INSPECTION STANDARD NaVON <br /> MS - <br /> 334 € � � ti � § i <br /> JULY 2006 <br />