Laserfiche WebLink
ATC Associates Inc. <br /> 1 <br /> CVYATC 1117 Lone Palm Avenue, Suite 201 <br /> Modesko, California 95351209-579-2221 <br /> ASSOCIATES INC , fax: 209-579-2225 <br /> oxygen , and ORP values will be measured using down-hole probes . As deemed <br /> appropriate , other parameters may be monitored using down-hole probe devices . <br /> Injection Pilot Testing <br /> Injection pilot testing will be conducted to evaluate the effectiveness of this technology <br /> to remediate dissolved hydrocarbons and fuel oxygenates within the saturated zone. <br /> Injection pilot testing will be conducted utilizing one injection well , however if injecting <br /> into that well does not yield suitable data , another well will be selected . <br /> A mobile ozone generator will be connected to the ozone sparging wells to inject ozone <br /> into the saturated zone . Ozone will be injected into each sparge well for approximately <br /> 15 to 20 minutes per hour over a period of four weeks at a rate of approximately 2 to 3 <br /> cubic feet per minute . This "micro-sparge" approach will provide information to evaluate <br /> the effectiveness of an ozone sparge system (low airflow and low pressure) . The <br /> duration and rate of ozone injection can be adjusted downward or upward as desired . <br /> The sparging wells will alternately be used as observation wells when not being actively <br /> utilized as the ozone injection well . Monitoring parameters will be periodically measured <br /> in nearby monitoring wells during the test. <br /> WORK SCHEDULE <br /> Following receipt of SJCEHD approval of the Workplan , ATC will initiate the project as <br /> soon as possible . ATC will secure an access agreement with the Delta Reclamation <br /> District and prepare a drilling permit. With the submittal of the drilling permit application , <br /> ATC anticipates that well permitting should take approximately two weeks ; well <br /> installation should take approximately one week. The pilot test is scheduled to take 4 <br /> weeks . Soil and groundwater analytical test results should be received within 10 to 15 <br /> days of sample delivery . Data interpretation and report preparation are expected to <br /> take five to six weeks. The estimated project schedule does not include allowances for <br /> delays or standby time due to inclement weather, Reclamation District access problems <br /> or other factors beyond the control of ATC . <br /> DATA EVALUATION AND REPORTING <br /> Following receipt of the laboratory analyses of soil and groundwater samples , ATC will <br /> evaluate the information and prepare a summary report. The report will be submitted to <br /> the SJCEHD for review and comment. <br /> KIR 2009 WP for Pilot Testing.doe ATC Associates Inc. <br /> S:\Environmental\62514 — KIR ATC Project No. 54.62514.0001 <br /> Page 10 <br />