My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHT MILE
>
11530
>
2900 - Site Mitigation Program
>
PR0541077
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 11:01:42 AM
Creation date
7/10/2019 9:52:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0541077
PE
2960
FACILITY_ID
FA0023517
FACILITY_NAME
PS MARINA 5 / KING ISLAND RESORT
STREET_NUMBER
11530
Direction
W
STREET_NAME
EIGHT MILE
STREET_TYPE
RD
City
STOCKTON
Zip
95219
APN
07119006
CURRENT_STATUS
01
SITE_LOCATION
11530 W EIGHT MILE RD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STANDARD OPERATING PROCEDURE <br /> SOIL BOREHOLE DRILLING, REMEDIATION WELL INSTALLATION, AND SOIL, SAMPLING <br /> Drilling and Soil Sampling <br /> Permits, Site Safety Plan. Utility Clearance <br /> ATC Associates hie. (ATC) obtains all the required permits, unless otherwise contractually directed, ATC <br /> prepares a site specific Site Safety Plan detailing site hazards, site safety and control, decontamination <br /> procedures, and emergency response procedures to be employed throughout the defined phase of work. At <br /> least 48 hours prior to drilling. Underground Service Alert (USA) or an equivalent agency is notified of the <br /> planned work. ATC attempts to locate all underground and aboveground utilities by site inspection (in <br /> conjunction with it's' subcontractors and knowledgeable site managers, if available), and review of site as- <br /> built drawings. ATC may employ a private, professional utility locator to refine the site utility inspection. <br /> Drilling Equipment <br /> All soil borings are drilled using a Track-mounted hollow-stem auger drill rig, unless site conditions warrant <br /> a different drilling method. Subsurface conditions permitting, tire first five feet of each boring is advanced <br /> using a hand-auger or post-hole digger. All drilling equipment is inspected daily and maintained in safe <br /> working condition by the operator. All down-hole drilling equipment is steam cleaned prior to arriving on <br /> site. Working components of the drill rig near the borehole, as well as augers and drill rods are thoroughly <br /> steam cleaned bchveen each boring location. All ATC drilling and sampling methods are consistent with <br /> ASTM Method D4 452-80 and local, stale and federal regulations. <br /> Soil Sampling and Lithologic Description <br /> Whenever possible and approved by the appropriate regulatory agency, the first ATC boring to be drilled at <br /> a site is continuously cored to obtain a complete lithologic description. Otherwise, soil samples are typically <br /> collected every 5 feet to the total depth explored, using brass tubes fitted in a California-modified split- <br /> spoon sampler. If copper or zinc contamination is the subject of the investigation, stainless steel liners are <br /> used instead of brass. Additional soil samples may be collected based upon significant changes in lithology <br /> or in areas of obvious soil contamination. During soil sample collection, the split spoon sampler is driven 18 <br /> to 24 inches past the lead auger by a 140-pound hammer falling a minimum of 30 inches. The number of <br /> blows necessary to drive the sampler and the amount of soil recovered is recorded on the Field Exploratory <br /> Soil Boring Log. The soil sampler and liners are cleaned with an Alconox® solution and rinsed with tap <br /> water prior to each sampling event. New liners are used whenever a soil sample may be retained for <br /> laboratory analysis. <br /> Soil samples selected for laboratory analysis are sealed on both ends with Teflon tape and plastic end caps. <br /> The samples are labeled, documented on a chain-of-custody form and placed in a cooler for transport to a <br /> state-certified analytical laboratory. Soil contained in remaining liners is removed for lithologic descriptions <br /> (according to the Unified Soil Classification System). Additional soil is screened for organic vapors by <br /> placing approximately 30 grams of soil in a sealed plastic bag or a glass jar sealed with aluminum foil. The <br /> bag or jar is left undisturbed for approximately 15 minutes, in the sun if possible. The headspace in the bag <br /> is accessed in a manner to minimize entry of outside air, and is tested for total organic vapor using a <br /> calibrated photo ionization detector (PID). The results of the field screening are noted with the lithologic <br /> descriptions on the Field Exploratory Soil Boring Log. <br /> On encountering an impermeable (clayey) layer three feet or more in thickness below a saturated permeable <br /> layer, where the impermeable layer is considered to be a possible confining layer for an underlying aquifer, <br /> drilling is halted until a decision to proceed is obtained from the project manager. This process minimizes <br />
The URL can be used to link to this page
Your browser does not support the video tag.