My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHT MILE
>
11530
>
2900 - Site Mitigation Program
>
PR0541077
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 11:01:42 AM
Creation date
7/10/2019 9:52:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0541077
PE
2960
FACILITY_ID
FA0023517
FACILITY_NAME
PS MARINA 5 / KING ISLAND RESORT
STREET_NUMBER
11530
Direction
W
STREET_NAME
EIGHT MILE
STREET_TYPE
RD
City
STOCKTON
Zip
95219
APN
07119006
CURRENT_STATUS
01
SITE_LOCATION
11530 W EIGHT MILE RD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATC Associates Inc. <br /> 1117 Lone Palm Avenue, Suite 201 <br /> Modesto, California 95351 <br /> 209-579-2221 <br /> MTC A S S O C T A T E S I N C . <br /> fax: 209-579-2225 <br /> STANDARD OPERATING PROCEDURE <br /> GROUNDWATER MONITOR WELL INSTALLATION AND DEVELOPMENT <br /> Prior to drilling, ATC will complete a notice of intention to drill a monitoring well and obtain groundwater <br /> monitor well construction variances from the appropriate regulatory agency. Copies of the original permits <br /> will be on site during drilling operations. <br /> Following completion of each well boring, a well will be constructed using 2-inch or 4-inch nominal <br /> diameter, Schedule 40, 0.020-inch machine slotted, polyvinylchloride (PVC) well screen from the bottom of <br /> the borehole to an appropriate distance above the static depth to groundwater to account for any season <br /> water level fluctuations. The remaining well string will be constricted of 2-inch or 4-inch nominal diameter <br /> Schedule 40 blank PVC casing. <br /> The bottom of the perforated interval will be capped with a flush-threaded PVC cap and the monitor well <br /> casing will be assembled and lowered into the open end of the drill pipe. No PVC cement of other solvents <br /> or glues will be used in construction of the monitor well. All well casing and screen material will be <br /> delivered to the site in factory containers. <br /> The ammlus of the well will be backfilled with clean #3 Monterey sand (or equivalent) filter pack to <br /> approximately 2 feet above the top of the well screen. The top of the filter pack will be direct measured <br /> with a weighted tape. A minimum 1.5400t layer of bentonite pellets will be placed on top of the filter pack <br /> and hydrated to form an annular seal . The bentonite pellets will be hydrated by adding approximately 1 <br /> gallon of water for each linear foot of bentonite. The remaining annular space to the surface will be filled <br /> with cement grout. The well will be completed at the ground surface with watertight flush-mounted, traffic <br /> rated vault. <br /> A minimum of 24 hours after well completion, the groundwater monitor well will be developed to remove <br /> sediment and to stabilize the filter pack by a combination of surging and pumping groundwater from the <br /> well. Purging will continue until movement of the fine sediment stabilizes or ceases and turbidity stabilizes. <br /> Groundwater purged from the well will be contained in 55-gallon dru ns and will remain on site pending the <br /> groundwater analytical results. <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.