Laserfiche WebLink
711 Materials, Inc. <br /> ALTA <br /> Spill Prevention, Control and Countermeasure Plan ENVIRONMENTAL <br /> 10.0 BRITTLE FRACTURE EVALUATION <br /> Ref:40 CFR 112.7(i) <br /> If a field-constructed aboveground container undergoes a repair, alteration, reconstruction or <br /> a change in service that might affect the risk of a discharge or failure due to brittle fracture or <br /> other catastrophe, or has discharged oil or failed due to brittle fracture failure or other <br /> catastrophe, evaluate the container for risk of discharge or failure due to brittle fracture or <br /> other catastrophe and as necessary, take appropriate action. <br /> The facility contains no field-constructed aboveground containers. Any container failures will be <br /> evaluated and the container repaired or replaced as necessary. <br /> Alta Environmental 23 <br /> BASR-19-8895 <br /> July 3, 2019 <br />