My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STAGECOACH
>
2714
>
2800 - Aboveground Petroleum Storage Program
>
PR0528419
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 1:05:56 PM
Creation date
7/10/2019 10:46:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0528419
PE
2832
FACILITY_ID
FA0014705
FACILITY_NAME
711 MATERIALS
STREET_NUMBER
2714
STREET_NAME
STAGECOACH
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
17334014
CURRENT_STATUS
01
SITE_LOCATION
2714 STAGECOACH RD
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
711 Materials, Inc. <br /> ALTA <br /> Spill Prevention, Control and Countermeasure Plan ENVIRONMENTAL <br /> 12.0 FACILITY DRAINAGE AND TRANSFER OPERATIONS <br /> 12.1 General Facility Drainage <br /> The facility site is relatively level, gently sloping to the west-northwest. The facility is bounded <br /> by Duck Creek on the north, undeveloped industrial parcels on the east and west, and <br /> developed industrials sites to the south. Except for Duck Creek, the site and adjacent sites <br /> are relatively flat and no storm water run-on from adjacent parcels is expected. Stormwater <br /> is contained and directed to storm drain inlets, the boat ramp containment tank, or the <br /> concrete recycling unit. <br /> 12.2 Drainage from Containment Areas <br /> Ref:40 CFR 112.8(b)Facility drainage. <br /> All secondary containment is located indoors or under canopy and is not exposed to storm <br /> water. Any accumulation in secondary containment structures is removed by an outside <br /> contractor. <br /> 12.3 Facility Transfer Operations <br /> Ref:40 CFR 112.8(d) <br /> This section lists the specific requirements in 40 CFR 112.8(d) - Facility transfer operations, <br /> pumping and facility process. A facility response addresses each requirement and describes <br /> how the facility complies. <br /> (1) Provide buried piping that is installed or replaced on or after August 16, 2002, with <br /> a protective wrapping and coating. You must also cathodically protect such buried <br /> piping installations or otherwise satisfy the corrosion protection standards for <br /> piping in Part 280 of this chapter or a State program approved under Part 281 of <br /> this chapter. If a section of buried line is exposed for any reason, you must carefully <br /> inspect it for deterioration. If you find corrosion damage, you must undertake <br /> additional examination and corrective action as indicated by the magnitude of the <br /> damage. <br /> Facility Response: <br /> There are no USTs at the site thus there is no buried petroleum transfer piping at <br /> the facility. <br /> (2) Cap or blank-flange the terminal connection at the transfer point and mark it as to <br /> origin when piping is not in service or is in standby service for an extended time. <br /> Facility Response: <br /> Pipelines not in service or on standby for an extended period are capped or blank- <br /> flanged and marked as their origin. <br /> (3) Properly design pipe supports to minimize abrasion and corrosion and allow for <br /> expansion and contraction. <br /> Alta Environmental 25 <br /> BASR-19-8895 <br /> July 3, 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.