Laserfiche WebLink
711 Materials, Inc. <br /> ALTA <br /> Spill Prevention, Control and Countermeasure Plan ENVIRONMENTAL <br /> Facility Response: <br /> Pipe supports are properly designed to minimize abrasion and corrosion and to <br /> allow for expansion and contraction. <br /> (4) Regularly inspect all aboveground valves, piping and appurtenances. During the <br /> inspection you must assess the general condition of items, such as flange joints, <br /> expansion joints, valve glands and bodies, catch pans, pipeline supports, locking <br /> of valves and metal surfaces. You must also conduct integrity and leak testing of <br /> buried piping at the time of installation, modification, construction, relocation or <br /> replacement. <br /> Facility Response: <br /> The Facility conducts monthly visual inspections of all aboveground valves, piping, <br /> and appurtenances. The Facility also conducts comprehensive annual inspections. <br /> Inspection forms are including in Appendix H. <br /> (5) Warn all vehicles entering the facility to be sure that no vehicle will endanger <br /> aboveground piping or other oil transfer operations. <br /> Facility Response: <br /> Aboveground piping and other aboveground oil transfer equipment are located <br /> within the maintenance building. <br /> Alta Environmental 26 <br /> BASR-19-8895 <br /> July 3, 2019 <br />