My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOFF
>
1515
>
2800 - Aboveground Petroleum Storage Program
>
PR0528646
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 1:16:18 PM
Creation date
7/10/2019 10:59:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0528646
PE
2832
FACILITY_ID
FA0017929
FACILITY_NAME
SPEEDCO # 944
STREET_NUMBER
1515
STREET_NAME
HOFF
STREET_TYPE
DR
City
RIPON
Zip
95366
APN
24534026
CURRENT_STATUS
01
SITE_LOCATION
1515 HOFF DR
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPILL PREVENTION, CONTROL AND COUNTERMEASURE <br /> PLAN 5-YEAR COMPLIANCE REVIEW [40 CFR 112.5(b)] <br /> Love's/Speedco#944 must review and evaluate this SPCC Plan at least once every five years per Title 40 Code <br /> of Federal Regulations (CFR) [§112.5(b)]. Following this review and evaluation, Love's/Speedco #944 must <br /> amend the SPCC Plan within 6 months of the review to include more effective prevention and control <br /> technologies if they: (1) will significantly reduce the likelihood of a discharge from the Facility, and (2) have <br /> been field-proven at the time of review. Amendments to this plan must be implemented as soon as possible, <br /> but not later than six months following preparation of any amendment. Amendment of the Plan is also <br /> required in the event the Facility undergoes a "material change" as defined by 40 CFR §112.5(a). If equivalent <br /> environmental protection or an impracticability determination for containment or diversionary <br /> structures/equipment has been certified in this Plan by a Professional Engineer, changes to these <br /> requirements are considered technical amendments and require a Professional Engineer Certification [40 CFR <br /> §112.6(b)(2)(i)]. <br /> Review and evaluation of the SPCC Plan for the Love's/Speedco#944 facility has been completed on the dates <br /> shown below. The plan has been amended for the reasons noted below. <br /> REVIEW DATES <br /> [Required every five years] REASON FOR CHANGES <br /> Original SPCC Plan completed August 2006 <br /> Technical Amendment to address five year full SPCC <br /> Plan review. <br /> *November 2014 <br /> Technical Amendment to address partial SPCC Plan <br /> review and updates based on facility acquisition by <br /> Love's. Facility Manager was utilized as agent to <br /> *September 2018 acquire specific information regarding ownership, <br /> management personnel,OWS, diesel priming tanks <br /> and transformer use. Also,the tank inspection <br /> protocol and inspection forms were updated to <br /> implement STI SP001. <br /> Technical Amendment to address update following <br /> CUPA inspection, including updates to contact <br /> information, personnel,tank inspection protocol and <br /> *July 2019 facility diagram. <br /> III <br />
The URL can be used to link to this page
Your browser does not support the video tag.