Laserfiche WebLink
Notes: <br /> 1. Place an asterisk (*) by those review dates where the SPCC Plan was amended and summarize the <br /> amendment in the table above. Non-technical amendments, such as changes to phone numbers, names, <br /> etc., do not require Professional Engineer Certification [40 CFR§112.3(d)]. <br /> 2. A Professional Engineer must certify technical amendments to equivalent environmental protection or an <br /> impracticability determination for containment or diversionary structures/equipment in this Plan. If a <br /> technical amendment was made, include the additional Professional Engineer Certification [40 CFR <br /> §112.5(c)]. <br /> 3. This SPCC Plan complies with the provisions of 40 CFR§112 <br /> Note: See Sections 3.3 and 3.4 of this SPCC Plan for information on the required frequency of Plan review and <br /> amendment. <br /> iv <br />