Laserfiche WebLink
�TM <br /> APPENDIX I:SPCC PLAN CROSS-REFERENCETABtE f <br /> _CFR Reference Requirement Description Plan Section_ (/ <br /> 112.3(d)(1) Professional Engineer Certification Page4 <br /> Discharge Notification to the EPA Region VI Administrator Page iii, <br /> 112.4(a) <br /> Section 7.7 <br /> 112.5(b) Management of Five Year Review Section 11 <br /> Section 1 <br /> 112.7 General Requirements <br /> 112.7(a)(1) Plan Contents-Discussion of facility's conformance with the Section 1 <br /> requirements of 40 CFR 112. <br /> 112.7(a)t2) Plan Contents-Deviations from requirements of 40CFR 112,as Not Applicable <br /> allowed. <br /> 112.7(a)(3) Plan Contents—Description of physical layout of facility and Section 2 and <br /> facility diagram. Appendix A <br /> 112.7(a)(3)(i) Plan Contents—Type of oil in each container and its storage Section 2.2&23 <br /> rapacity. <br /> 112.7(a)(3)(11) Plan Contents—Discharge prevention measures Section3 <br /> 112.7(a)(36i) Plan Contents—Discharge or drainage controls and procedures Section 7.1 <br /> for the control of a discharge <br /> 112.7(a)(3)(iv) Plan Contents—Countermeasure for discharge discovery, Section <br /> response, and cleanup. 7,2 <br /> 112.7(a)(3)(v) Plan Contents—Methods of disposal of recovered materials Sections 7.2,7.3, <br /> 10 <br /> 112.7(a)(3)(vi) Plan Contents—Contact list and phone numbers of the facility Page 4 <br /> response coordinator, National Response Center,cleanup <br /> _ contractors, and appropriate agencies. <br /> 112.7(a)(4) Plan Contents—Agency reporting procedures Section7 <br /> 112.7(a)(5) Plan Contents—Reporting procedures organization. Section 7.7 <br /> 112.7(b) Plan Contents—Prediction of direction,rate of flow,an notal Appendix A, <br /> quantity of oil that could be discharged from major equipment <br /> failures. <br /> 112.7(,) Plan Contents—Description of containment and/or diversionary Notapplicable <br /> structures or equipment. <br /> 112.7(d) Plan Contents—Explanation of impracticability of contammentm- Not applicable <br /> diversionary structures or equipment. <br /> 112.7(d)(1) Plan Contents—oil spill contingency plan Section7 <br /> 112.7(d)(2) Plan Contents—Written commitment of manpower, Section 7.0 <br /> and materials. <br /> 112.7(e) Inspections,test,and records. Section 3.1 <br />