Laserfiche WebLink
112.7(f)(1) Personnel/Training-Oil-handling personnel training. Section 8 and <br /> Appendix C <br /> 112.7(f)(2) Personnel/Training-Designation of a person who is accountable Page <br /> for discharge prevention and reports to facility management <br /> 112.7(f)(3) Personnel/Training-Schedule of training Section8 <br /> Appendix C <br /> 112.4(a) Discharge Notification to the EPA Region IV Section 7 <br /> 112.5(b) Management of five-year review Section 11 <br /> 112.7(a)(1) Plan Contents-Discussion of facility's conformance with the Sections 1,2.4 <br /> requirements of 40 CFR 112. <br /> 112.7(a)(2) Plan Contents-Deviations from requirements of 40CFR 112,as Not Applicable <br /> allowed. <br /> 112.7(11)(3) Plan Contents-Description of physical layout of facility and Section and <br /> facility diagram. Appendix A <br /> 112.7(a)(3i(i) Plan Contents-Type of oil in each container and its storage Section 2 and <br /> capacity. _ Appendix B _ <br /> 112.7(a)(3)(ii) Plan Contents-Discharge prevention measures Section <br /> 112.7(a)(3)(iii) Plan Contents-Discharge or drainage controls and procedures Section <br /> _ forthe control of a discharge <br /> 112.7(a)(3)(iv) Plan Contents-Countermeasure for discharge discovery, Section 3 <br /> response,and cleanup. <br /> 112.7(a)(3)(v) Plan Contents-Methods of disposal of recovered materials Section57.5 and <br /> 7.6 <br /> 112.7(a)(3)(vi) Plan Contents-Contact list and phone numbers of the facility Page4 <br /> response coordinator, National Response Center,cleanup <br /> contractors,and appropriate agencies. <br /> 112.7(a)(4) Plan Contents-Agency reporting procedures Section 7.5 and <br /> 7.6 <br /> 112.7(a)(5) Plan Contents-Reporting procedures organization. Section 7.7 <br /> 112.7(b) Plan Contents Prediction of direction,rate of flow,and total Section 9; <br /> quantity of oil that could be discharged from major equipment Appendix A, <br /> failures. <br /> 112.7(c) Plan Contents-Description of containment and/or diversionary Not Applicable <br /> structures or equipment. <br /> 112.7(d) Plan Contents-Explanation of impracticability of containment or Not Applicable <br /> diversionary structures or equipment. <br /> 112.7(d)(1) Plan Contents-oilspill contingency plan Section _ <br /> 112.7(d)(2) Plan Contents-Written commitment of manpower,equipment, Pagel <br /> and materials. <br /> 112.7(e) Inspections,test, and records. Section 3.1 and <br /> Appendix C_ <br /> 112.7(0(1) Personnel/Training-Oil-handling personnel training. Section <br /> Appendix H <br /> 112.7(f)(2) Personnel/Training-Designation of a person who is accountable Section 8.0 <br /> for discharge prevention and reports to facility management. <br />