Laserfiche WebLink
SANJ Q A Q U I N Environmental Health Department <br /> COUNTY <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name: I Facility Address: -ate: <br /> LDS-STOCKTON BISHOPS STOREHOUSE 3112 LOOMIS RD STOCKTON June 25 2019 <br /> Other Violations <br /> 4010 See below Unlisted AdminlstrationlDocumentation violation .V .R .COS <br /> 4020 See below Unlisted Training violation In In In COS <br /> 4030 See bel ow un listed OperationarMaintenance vl cation 0V 0R OCOS <br /> 4000 See below Unlisted ReleaseJLeaksl5pills violation In In In COS <br /> 4050 See below Unlisted Abandonmendillegal Dlsposallunauthorized Treatment violation .V .R .COS <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item N Remarks <br /> 302 CFR 112.5(b)Failed to review Plan once every five years and/or implement any resulting amendments. <br /> The plan was last certified by a professional engineer in 2013.There was no evidence or statements in the SPCC plan <br /> that would indicate that the SPCC plan has been evaluated and reviewed after 2013. <br /> Notwithstanding compliance with paragraph (a) of this section,complete a review and evaluation of the SPCC Plan at <br /> least once every five years from the date your facility becomes subject to this part;or, if your facility was in operation <br /> on or before August 16,2002,five years from the date your last review was required under this part.As a result of this <br /> review and evaluation, you must amend your SPCC Plan within six months of the review to include more effective <br /> prevention and control technology if the technology has been field-proven at the time of the review and will significantly <br /> reduce the likelihood of a discharge as described in §112.1(b)from the facility.You must implement any amendment <br /> as soon as possible,but not later than six months following preparation of any amendment.You must document your <br /> completion of the review and evaluation, and must sign a statement as to whether you will amend the Plan, either at <br /> the beginning or end of the Plan or in a log or an appendix to the Plan.The following words will suffice,'I have <br /> completed review and evaluation of the SPCC Plan for(name of facility)on(date), and will(will not)amend the Plan as <br /> a result.' <br /> Review the SPCC plan and make necessary amendments,technical amendments need to be certified by a <br /> professional engineer, if no amendments are made, document the completion of the review and evaluation either at <br /> the beginning or end of the Plan or in a log or appendix to the plan. <br /> This is a Class II violation. <br /> 601 CFR 112.7 Failure of Plan to fulfill basic requirements including a cross-referencing section. <br /> The Spill Prevention,Control,and Countermeasure(SPCC)Plan does not follow the order or requirements in 40 CFR <br /> Part 112, and an accurate cross-reference was not provided.The cross-reference in the SPCC plan refers to incorrect <br /> pages or section numbers for the discussions of the regulations.If you do not follow the sequence specified in 40 CFR <br /> 112 for the Plan,you must prepare an equivalent Plan and supplement it with a section cross-referencing the location <br /> of requirements in 40 CFR 112 and the equivalent Plan. Immediately amend the SPCC Plan to include an accurate <br /> cross-reference or to follow the required sequence. <br /> This is a minor violation. <br /> FMW37W PRO53UU SO001 06252019 <br /> EHD1801 Rcr.09cr7c 8 Page 4 of Abaveg J Ptlrtlam Sandal AC OR <br /> 1868 E. Hazelton Avenue I Stockton,California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjcehd.com <br />