Laserfiche WebLink
• <br /> 02 October 2003 <br /> AGE-NC Project No. 01-0865 <br /> Page 4 of 4 <br /> the monitoring of monitoring well MW-3 for the duration of the pilot study utilizing <br /> the same constituents. <br /> 10. The Work Plan does not propose monitoring of the ORC injection after 12 weeks, H&H <br /> Marina needs to propose monitoring until the concentrations ofparameters monitored return <br /> to baseline concentrations. <br /> AGE agrees; reference answer 6. <br /> 11. The Work Plan does not discuss the potential effects of ORC. On the site soils, which are <br /> high in organic content(i.e., peat soils). H&H Marina needs to include this information. <br /> AGE understands that the Regenesis Company has experience in delta peat, with <br /> success in areas where the organic content tends to be low; the company was <br /> uncertain of the success in areas where organic content is high. The potential effects <br /> of ORC could be peat oxidation,possible carbon dioxide pocketing, and subsidence <br /> of the organic material; other problems may occur in relation to the ORC but are <br /> unknown at the time. Both AGE and Regenesis agreed that the purpose of a pilot <br /> study would be to determine if there are any inclement side effects to the use of ORC <br /> at this specific site. <br /> If you have any questions or require further information,please contact me at(209)467-1006. <br /> Sincerely, <br /> Advanced GeoEnvironmental, Inc. <br /> anie�ach <br /> Staff Geologist <br /> cc: Mr. Andrew Smith,Herman&Helen's Marina <br /> 1,-Os. Margaret Lagorio, San Joaquin County Environmental Health Department <br /> Advanced Geo Environmental,Inc <br />